Featured Projects
Project Menaiktaraf Sungai Kayu Ara Di Kampung Cempaka, Taman Mayang dan Kerja-kerja Berkaitan, Petaling, Selangor.
Client:� Lingkaran Trans Kota Sdn Bhd
Gerbang Nusajaya Phase 1 Detailed Master Infrastructure
Client:� UEM Sunrise Sdn Bhd
A project involves Civil and Structural Engineering Consultancy Services – Water and Sewer Reticulation System.
Proposed Pulau Jerejak Development – Access Interchange and Bridge Design
Client:� Ideal Gim Venture Sdn. Bhd.
SPJ Pan Borneo Project from Serian to Pantu – Highway Geometrics Review and Alternative Road Profile Design
Client: Kimlun Sdn. Bhd.
Design review
Proposed Mixed Development at Penang World City, Persiaran Sg. Nibong, Mukim 13, Daerah Timur Laut, Pulau Pinang
Client: Tropicana Ivory Sdn Bhd
A project involves Civil, Structural, Highway and Geotechnical Engineering Consultancy Services on Bridges, Viaducts, Elevated Ramps, Interchange, Underpass and Upgrading of Roads for Approximately 67.56 acres of Existing land- Civil, Structural, Highway and Geotechnical Engineering Consultancy Services on Bridges, Viaducts, Elevated Ramps, Interchange, Underpass and Upgrading of Roads for Approximately 67.56 acres of Existing land.
Proposed Mixed Development at Penang World City, Persiaran Sg. Nibong, Mukim 13, Daerah Timur Laut, Pulau Pinang
Client: Tropicana Ivory Sdn Bhd
A project involves Civil, Structural, Highway and Geotechnical Engineering Consultancy Services on Bridges, Viaducts, Elevated Ramps, Interchange, Underpass and Upgrading of Roads for Approximately 67.56 acres of Existing land- Civil, Structural, Highway and Geotechnical Engineering Consultancy Services on Bridges, Viaducts, Elevated Ramps, Interchange, Underpass and Upgrading of Roads for Approximately 67.56 acres of Existing land.
Highway, Railway Engineering and Transportation (Design & Implementation)
Privatization of Expressway
Highway, Railway Engineering and Transportation (Studies)
Traffic Study for Proposed Privatization of Expressway
Highway, Railway Engineering and Transportation (Design & Implementation)
Interchange Design
Access Interchange Planning design for a Seremban KTM Station
Highway, Railway Engineering and Transportation (Studies)
Client: Storyworld Sdn. Bhd.
Traffic Impact Assessment (TIA) Dreamhomes @ Cyberjaya – Phase 1
Highway, Railway Engineering and Transportation (Studies)
Client: Gamuda Engineering Sdn. Bhd.
Traffic Impact Assessment (TIA) for CADANGAN MEREKABENTUK DAN MEMBINA 1 BLOK PANGSAPURI (RUMAH SELANGORKU � RSKU) 19 TINGKAT YANG MENGANDUNGI:- 280 UNIT KEDIAMAN (JENIS C2 � 900KP) TERMASUK 2 UNIT OKU, DI ATAS LOT NO. PT 28767, PUNCAK BESTARI, 42300 BANDAR PUNCAK ALAM, SELANGOR DARUL EHSAN
Highway, Railway Engineering and Transportation (Studies)
Client: Elite Starhill Sdn. Bhd.
Traffic Impact Assessment (TIA) for Imbi Residences Tower at Lot 1372, Jalan 1/77B, Kuala Lumpur
Highway, Railway Engineering and Transportation (Studies)
Client: EDARAN SWM Sdn. Bhd.
Traffic Impact Assessment (TIA) for Regional Operations Centre at Bertam, Mukim Tanjung Minyak, Melaka
Highway, Railway Engineering and Transportation
Client: SJIC Bina Sdn. Bhd.
Ir. Lee Choy Hin, Managing Director of G&P Highways & Transportation Sdn Bhd acted as expert witness for the arbitration case for SJIC Bina Sdn Bhd
Planning and Civil Design for Proposed Residential South, Puteri Harbour, Nusajaya, Johor.
Client: Nusajaya Premier Sdn. Bhd..
Planning and engineering design of civil and infrastructure for Proposed Residential South, Puteri Harbour, Nusajaya, covering an area of 207 acres.
Planning and Infrastructure Design for Gerbang Nusajaya Mixed Development, Johor.
Client: Nusajaya Rise Sdn. Bhd.
Review of planning and engineering design of major infrastructure for the 4,000 acre township of Gerbang Nusajaya Mixed Development, water and sewage reticulation, and treatment plants (for Phase 1).
Engineering Design of Access Road from Route 18 to Iron Ore and Pellet Plant, Manjung, Perask
Developer: Vale (Malaysia) Minerals Sdn. Bhd.
A project involves design and upgrading of an access road from Route 18 to Iron Ore and Pellet Plant. The work consists of designing a new road and upgrading work for an existing road to cater for the future traffic and provide compatibility of road cross-section to comply with safety requirments.
Traffic Impact Assessment for Townvilla and Condominium Development at Bandar Puteri, Puchong, Selangor
Client: Flora Development Sdn. Bhd.
A project involves data collection and analysis, the study of future traffic demand by considering the future development at the vicinity, existing road and road upgrading work to ensure smooth flow of traffic at the access road, as well as smooth traffic movement in and around the Flora’s development.
Engineering Design of Access and Infrastructure for the Proposed Petrol Station at KM 60 Karak Highway, Bentong
Client: Jernih Cendana Sdn. Bhd.
A project involves engineering design of expressway diverging and merging lane, major earthwork, sewerage system, internal road and drainage system for the proposed petrol station.
Planning and Infrastructure Design for 5 units of Bungalow Lot at Bukit Tunku, Kuala Lumpur
Client: Pelanduk Puncak Sdn. Bhd.
A project involves planning and engineering design of major infrastructure e.g. earthwork, sewerage system, water supply, road and drainage system for 5 units of bungalow lot.
Traffic Study for Media City Development, Kuala Lumpur
Client: Media City Development Sdn. Bhd.
A project involves data collection and analysis, the study of future traffic demand, existing road and T-intersection improvement to cater for future demand and engineering design of dedicated grade to separate ingress and egress to Media City.
Engineering Design of Access Road to Puah & Tembat Dam & Upgrading of 3 Nos. Existing T-intersection at Federal Route 185, Hulu Terengganu
Client: Tenaga Nasional Berhad
Design of access road to Puah and Tembat dam, upgrading and road widening of 3 nos. Existing T-intersection at Federal Route 185 to cater for future traffic and provide compatibility of road cross-sectionto comply with safety requirments.
Engineering Design of Access & Traffic Impact Assessment for Mixed Development at Sungai Buloh, Selangor
Client: Fortson Properties Sdn. Bhd.
A project involves data collection and analysis, the study of future traffic demand by integration of Kg. Baru Sg. Buloh MRT station, existing road and T-intersection improvement to cater for the future demand and engineering design of dedicated ingress and egress to Fortson’s development.
Traffic Impact Assessment & Internal Traffic Circulation Study for Service Apartment Development at Jalan Talalla, Kuala Lumpur
Client: Start Effort Sdn. Bhd.
A project involves data collection and analysis, the study of future traffic demand, external and internal traffic circulation study to ensure smooth flow of traffic at the access road, as well as smooth traffic movement in and around the new apartment.
Traffic Impact Assessment for Semi-D Shop Office Development at Kota Damansara
Client: Prosper Villa Sdn. Bhd.
A project involves data collection and analysis, the study of future traffic demand, to ensure efficient flow of traffic at the access road as well as smooth traffic movement in and out the development.
Engineering Design of Access, Traffic Impact Assessment & Traffic Light Installation for Condominium Development at Setapak, Kuala Lumpur
Client: Beneton Properties Sdn. Bhd.
A project involves data collection and analysis, the study of future traffic demand, traffic light installation, existing road and T-intersection improvement to cater for the future traffic.
External & Internal Traffic Circulation Study for Hospital Raja Permaisuri Bainun, Ipoh
Client: Hospital Raja Permaisuri Bainun
A project involves of external and internal traffic circulation study to ensure efficient flow of traffic at all the access roads, as well as smooth traffic movement in and around the new hospital through effective and efficient traffic management measures.
New Link to Westport Container Terminal
Client: Wijaya Baru Sdn Bhd
Design of the 700m long bridge foundations with ground treatment of the approach embankments linking existing road to Westport Container Terminal 4 (CT4)
Indah Point Interchange at Pulau Indah, Selangor, Malaysia.
Client: Wijaya Sdn Bhd
Design of the 1700m long bridge with ground treatment for approach embankments to the two ramps at Indah Point
Design and Construction of Jelutong Expressway, Penang, Malaysia.
Client: IJM Corporation Bhd / JKR Penang
Engineering Design, Construction and Completion of the Jelutong Expressway including interchanges and bridges implemented under privatization concept
Design and Construction of Interchange Access to Water Front Cit, Penang, Malaysia.
Client: IJM Corporation Bhd / JKR Penang
Engineering Design, Construction and Completion of Interchanges and Upgrading Works for Waterfront City (E-Gate) developed by IJM Corporation Bhd.
Vehicular and Pedestrian Bridges at Malacca River, Melaka, Malaysia
Client: Kejuteraan Asas Jaya Sdn Bhd / Majlis Bandaraya Melaka Bersejarah
Engineering Design of three Vehicular and two Pedestrian Bridges in Melaka town
Approach Embankment to Bridge across PLUS Expressway at Bernam Jaya
Client: Syarikat Muhibbah Perniagaan & Pembinaan Sdn Bhd
Design of alternative foundation system for the bridge approach embankment. The alternative foundation system proposed is pile embankment with variable Pile length (transition piles) together with temporary surcharge. This alternative system prevents differential settlement between the bridge and approach embankment which is a common problem on the bridge approaches
Slope Rehabilitation Works at KM 32.6 SB Linkedua Expressway near Senai, Johor
Client: Linkedua Expressway Bhd
Design of the rehabilitation measures to remedy the 2-berm slope with improvement of the surface and sub-surface drainage system
Softground Improvement Works at KM 64BB, Section N2, North-Sounth Expressway near Pendang, Kedah
Client: PLUS Expressway Bhd
Design of remedial measures to alleviate uneven surface settlement and depressions on road embankments supported by piles with isolated pile caps. A very cost effective & a short construction duration method on remedial work was successfully innovated to solve the problem
Bandar Botanic Development, Klang
Client: Harum Intisari Sdn Bhd
Design of ground treatment and foundation system for bridges and all roads within the development ensuring long term performance of these infrastructures and to provide comfortable driving experience of all users
Bandar Botanic Development, Klang
Client: Harum Intisari Sdn� Bhd
Design of ground treatment and foundation system for� bridges and roads within the development over soft compressible Marine Clay
Investigation & Remedial Design of NSE Central Link & KLIA Expressway KM 21.5 to KM 22.1
Client: Pengurusan Lebuhraya Berhad
Investigation into the serviceability problem encountered at the affected stretch
The works involved planning of subsurface investigation and instrumentation works to determine the causes of the serviceability problem and propose appropriate long-term remedial measures
Design and Construction of The Central Workshop Maintenance Railway Development at Batu Gajah, Perak
Client: Kinta Samudra Sdn Bhd
Design and construction of the central workshop over ex-mining land
The design and construction component involved piling works for the building structures, ground treatment using vertical drain and vibro-compaction for railway embankment and pound reclamation works
Remedial Work Design of Sg. Pasai Bridge, Sibu, Sarawak
Client: Tradewinds Plantation Services Sdn Bhd
Design of a titled abutment and approach embankment for 70m long, three span bridge across Sg. Pasai
Geotechnical works (foundation & ground treatment) for Kuala Lumpur � Putrajaya Dedicated Highway
Client: Leighton Contractors (M) Sdn Bhd (Motibina Sdn Bhd)
Review on the geotechnical works which include of based pile, caisson pile & ground treatment of the 26km Kuala Lumpur � Putrajaya Dedicated Highway
Kajang Traffic Dispersal Ring Road (Section 3C) � Silk
Client: Sunway Construction Sdn Bhd
Ground treatment design (piled embankment, stone column, surcharge, etc) of the 3.5km Kajang Dispersal Ring Road at Section 3B & 3C
Penang Urban Transport Study
Client: Penang State Government, Malaysia
The scope of the Study involves Problem Identification, Data Collection and Analysis. Transport Modeling, Proposed Solutions & Recommendations
The Study includes the evaluation of alternatives for the location of Penang Second Bridge, the option recommended was selected by the Government for implementation
The Study was done in association with Halcrow Construction Snd Bhd
Traffic Study for Malaysia
Client: Highway Planning Unit; Ministry of Works, Malaysia
This is an empirical study carried out to obtain passenger car equivalence (pce) and peak hour factor (phf) for rural conditions. The Study duration was 18 months involving analysis using Computer Simulation and Compilation of Findings for the data collected on main trunk roads throughout West Malaysia
The Study was done in association with Transport Research and Engineering LTD (TRE) and Institute for Transport Studies (ITS) University of Leeds, UK
Traffic Study for Bandar Muar, Malaysia
Client: Highway Planning Unit; Ministry of Works, Malaysia
The objective of the Study is to identify problems and issues and to recommend counter-measures to mitigate or resolve urban congestion in Bandar Muar. The Scope includes Evaluation of Alternatives & submission of Proposals to alleviate urban traffic congestion
Traffic Study and Preliminary Design of Jalan Paya Trubong, Penang, Malaysia
Client: Jabatan Kerja Raya Pulau Pinang, Malaysia
The Study was carried out to assess the capacity requirement of Jalan Paya Terubong to effectively serve the development corridor in central region of Penang Island
The Scope includes preliminary design for the upgrading of road and junctions of Jalan Paya Terubong based on the Study carried out
Capacity Study for Lane Extension of Penang Bridge, Penang, Malaysia
Client: Intria Bhd (UEM Group)
The Penang Bridge Concession Company, Intria Bhd under the UEM Group intended to extend the existing Penang Bridge due to congestion problem. Traffic Study was done to evaluate to proposed bridge extension
Penang LRT Studies
Client: Penang Government (Privatization Proposal)
The study was done in association with Bombardier Transportation and SNC-Lavalin of Canada as a privatization proposal to the Penang Government, The light rail transit (LRT) studies focused on Demand Forecasting, Route Selection and choice of Rolling Stocks covering Penang Island and Mainland Urban Centres
Proposed Bus Priority Scheme for Kuala Lumpur
Client: Dewan Bandaraya (City Hall) Kuala Lumpur
This was done as a Pilot Study to assess the need and implementation of Bus Priority Scheme in Kuala Lumpur. The Study included evaluation of Alternative Measures, Design and Implementation of the Scheme adopted based on the Study performed
The project was done in association with Acer Consultants Sdn Bhd