Featured Projects
Description: Detailed�Design, Tender Preparation And Construction Supervision For NGC Raw Water Source Works (SG LABU & SG LANGAT Intakes, Pump Stations, And Piping System For Raw Water And Effluent Discharge)
Client : Hartalega Holdings Berhad
Project Cost: RM25million
Services: Design and Supervision consultants
Description: Menaik Taraf Sistem Bekalan Air Lahad Datu
Client : Mestapex Konsep Sdn Bhd
Project Cost: RM125 million
Services: Design Consultant for Intake Works, Water Treatment Works and Distribution System.
Description: Proposed Sg. Rengit / Pengerang Distribution Improvement, Rehabilitation OF Bukit Tempayan Reservoir And Sg. Sayong Sludge Treatment Facility. Package 1 : Construction And Completion of 2ML Bukit Tempayan Reservoir And Associated Works
Client : Pengurusan Aset Air Bhd
Project Cost: RM2.5 million
Services: Design and Supervision consultants.
Description: Proposed Sg. Rengit / Pengerang Distribution Improvement, Rehabilitation OF Bukit Tempayan Reservoir And Sg. Sayong Sludge Treatment Facility.
Client : Pengurusan Aset Air Bhd
Project Cost: RM7.0 million
Services: Design and Supervision consultants.
Description: Proposed Sg. Rengit / Pengerang Distribution Improvement, Rehabilitation Of Bukit Tempayan Reservoir And Sg. Sayong Sludge Treatment Facility. Package 3 : Membina Dan MenyiapkanKerja-Kerja Menaiktaraf Pengagihan Air Di Sg. Rengit / Pengerang Serta Kerja-Kerja Yang Berkaitan.
Client : Pengurusan Aset Air Bhd
Project Cost: RM17.0 million
Services: Design and Supervision Consultant.
�
Description: Projek Pemasangan Paip Air Mentah dan Aerator Bagi Loji Rawatan Air Kota Lama Kiri, Kuala Kangsar
Client : Lembaga Air Perak
Project Cost: RM2 million
Services: Design and Supervision consultants
�
Description: Projek Perintis Penggunaan Kaedah Penapisan Tebing Sungai ( River Bank Filtration ) Di Loji Kota Lama Kiri, Kuala Kangsar
Client : Prima Utilities Sdn Bhd
Project Cost: RM4.4 million
Services: Design review of contractor�s proposed works
Description: Miri Water Supply Source Development Phase 1
Client : JKR Sarawak
Project Cost: RM38 million
Services: Detailed Design of Intake upgrading,� raw water pumps and pipework to transfer 240 Mld from Sg Bakong to Sg Liku
�
Description: Detailed Design of Flood Mitigation Measures for Jambuk Estate
Client : G&P Water
Project Cost: RM 40 million
Services: Design of flood water pumping station.
Description: Feasibility Study of Baleh Dam, Sarawak
Client : Sarawak Energy Bhd.
Consultancy Fees : RM7 million
Services : Pre-feasibility & Feasibility for hydrology and potential dam site & output of hydro power generation.
Description: Bintulu Phase 3 Water Treatment Plant
Client : LAKU Sarawak
Project Cost: RM 75 million
Services : Detailed design of 100 Mld WTP with in-filter DAF and dual media filter
Description: New Bertam DAF Plant
Client : Perbadanan Air Melaka
Project cost : RM 110 million
Services: Detailed design of 120 Mld WTP with in-filter DAF
Description: Projek Bekalan Air Luar Bandar (BALB) di Sarawak
Client : Puncak Niaga (M) Sdn Bhd
Project Cost: RM 700 million
Services: Liaison with JKR Sarawak & design consultants and technical review of design
Description: Ground water resources study in Batang Padang, Perak
Client : Sime Darby Bhd
Consultancy Fees : RM 10 Million
Services: Identify ground water potentials mapping and sustainability
Description: Involved deep drilling at hardrock acquifers
Description: River Bank Filtration (RBF) for Loji Kota Lama Kiri, Kuala Kangsar
Client : Lembaga Air Perak (LAP)
Project Cost: RM 4.4 million
Services : Technical review of design and contract management
Description: Miri Water Supply Source Development Phase 1
Client : JKR Sarawak
Project Cost: RM 38 million
Services : Detailed design of intake upgrading,� raw water pumps and pipework to transfer 240 Mld from Sg Bakong to Sg Liku
Description: Kajian Pelan Keselamatan Air (Water Safety Plan) Dan Pembangunan Garis Panduan WSP
Client : Suruhanjaya Perkhidmatan Air Negara (SPAN)
Project Cost: Nil
Services : Study and Development of WSP Guidelines.
Description: Feasibility Study And Conceptual Design Of Water Resources Development At Sungai Pontian Besar And the Construction of Sungai Pulai Barrage, Johor.
Client : BBA, Kementerian Alam Sekitar Dan Air
Project Cost: Nil
Services : Feasibility Study
Description: Cadangan Menambahbaik Sistem Agihan di Pagoh, Muar, Johor.
Client : Pengurusan Aset Air Bhd
Project Cost: RM15 million
Services : Design and Supervision Consultant.
Description: Detailed Design, Tender Preparation And Construction Supervision For NGC Raw Water Source Works (Sg LABU & SG LANGAT Intakes, Pump Stations, And Piping System For Raw Water And Effluent Discharge).
Client : Hartalega Holdings Berhad
Project Cost: RM25 million
Services : Design and Supervision Consultant
Description: Proposed Sg. Rengit / Pengerang Distribution Improvement, Rehabilitation Of Bukit Tempayan Reservoir And Sg. Sayong Sludge Treatment Facility. Package 2 : Construction And Completion Of Sg Sayong Sludge Treatment Facility And Associated Works.
Client : Pengurusan Aset Air Bhd
Project Cost: RM7.0 million
Services : Design and Supervision Consultant
Description: Conceptual Study Untuk Sludge Dewatering Facility Bagi Logi Rawatan Air Gunung Semanggol.
Client : Lembaga Air Perak
Project Cost: Nil
Services : Conceptual Study
Description: Kerja-Kerja Meningkatkan Sumber Air Mentah di Loji Rawatan Air Gemas, Negeri Sembilan.
Client : BBA, Kementerian Alam Sekitar Dan Air
Project Cost: RM12 million
Services : Design and Supervision Consultant
Description: Dam Safety Review of Semenyih Dam 2018.
Client : Pengurusan Air Selangor
Project Cost: Nil
Services : Dam Safety Review of Semenyih Dam
Description: Inspection Of Balancing Reservoir At Sg. Semenyih WTP.
Client : Syarikat Air Negeri Sembilan Sdn Bhd
Project Cost: Nil
Services : Site Inspection