ISO-Technical Colloquium is scheduled from 5pm to 6pm at G&P’s Conference Room.
If you are interested to attend our Technical and ISO Colloquium ,please contact us for more details at gnp-geo@gnpgroup.com.my
Date | Title Of Talks | Name Of Staff | Colloquium Type |
06/01/2022 | Soil Slope Stability | IR. JASON LIM AING HO | Training Colloquium |
13/01/2022 | Earthworks and PUB Protection for RTS Project | IR. LOW CHEE LEONG | Technical Colloquium |
20/01/2022 | Building Settlement Performance at BBR Phase R12B | IR. DR. WONG SHIAO YUN | Technical Colloquium |
27/01/2022 | Independent Review on Maintained Load Test Results | IR. TING DENG ING | Technical Colloquium |
08/02/2022 | Rock Slope Stability | MR. TIONG CHIONG NGU, PHILIP | Training Colloquium |
10/02/2022 | Procedure for rock slope and rock tunnel assessment | IR. KOO KUAN SENG | Technical Colloquium |
17/02/2022 | Design of Remedial and Construction Consideration for Distressed Precast Box Culvert Under Road B6 | IR. HO SHU FENG | Technical Colloquium |
24/02/2022 | Preliminary Geotechnical Assessment of a Site with Biomass | IR. DR. GUE CHANG SHIN | Technical Colloquium |
03/03/2022 | Training for SAFE | IR. DR. PUSPANATHAN SUBRAMANIAM | Training Colloquium |
10/03/2022 | Seismic Refraction Surveying | IR. TEI CHIEW LING | Technical Colloquium |
17/03/2022 | Slope strengthening works for wangsa maju | IR. NOOR AZLINA BTE AZHARI | Technical Colloquium |
24/03/2022 | Â Monsoon Drain Design at Batu Kawan | IR. LIANG YIT CHUNG, STEVE | Technical Colloquium |
05/04/2022 | Soil Nail Design | IR. KANG YEE PING | Training Colloquium |
07/04/2022 | Pergau Tunnel Strengthening Works | IR. HONG BOON KHANG, ASHTON | Technical Colloquium |
14/04/2022 | River Closure in Lingga, Sarawak | IR. ONG KAH PENG | Technical Colloquium |
21/04/2022 | Geotechnical Review for Second Trunk Road | IR. SOH TEK PENG | Technical Colloquium |
28/04/2022 | Introduction to Geotechnical Design Risks | MS. KHOO LAI PENG | Technical Colloquium |
10/05/2022 | Pull Out Test for Soil Nail | IR. KWANG KIM LUP | Training Colloquium |
12/05/2022 | Design and construction of foundation for highrise in Tropicana | MR. CHEE FONG WAH | Technical Colloquium |
19/05/2022 | Construction Issues on Retaining Wall | MS. LIM YOK CHIN | Technical Colloquium |
26/05/2022 | Reinforced Concrete (RC) Wall Integrated with Drain | MS. CHONG SHIN YEE | Technical Colloquium |
02/06/2022 | Proposed Development at Bukit Jambul, Penang | IR. MOSES HON CHA YAT | Technical Colloquium |
09/06/2022 | Foundation Design for Sunway Cochrane | IR. NOR AZRA BT AB. WAHAB | Technical Colloquium |
16/06/2022 | Hill Park 4, Kajang | MR. ALAN YAP VOON CHUAN | Technical Colloquium |
23/06/2022 | Alternative Design for Foundation and Retaining Wall TATUC | MR. DESMOND TEH KOK LOONG | Technical Colloquium |
30/06/2022 | Maharani Energy Gateway, Muar, Johor | MS. TAN PEI YING | Technical Colloquium |
05/07/2022 | Vane Shear Test + Standard Penetration Test & Mackintosh Test + Permeability Test & Seepage | MR. TEO LII BINN | Training Colloquium |
07/07/2022 | Introduction to ISO System | IR. DR. WONG SHIAO YUN | ISO Colloquium |
14/07/2022 | Bluewater Pond, Seri Kembangan | MS. CHIN YU LIN, ELYNN | Technical Colloquium |
21/07/2022 | Penang South Reclamation (Island B) | MR. DERRICK TAN WEE KEON | Technical Colloquium |
28/07/2022 | Design of Ground Treatment for Reclamation (Rayston) | MR. JOACHIM GERARD BOK | Technical Colloquium |
04/08/2022 | Piled Raft Analysis | IR. TEH WAI SAN | Training Colloquium |
11/08/2022 | Piling Works for Northern Bridge at Gamuda Cove | MR. KHAIRUL IZHAR BIN KASIM | Technical Colloquium |
18/08/2022 | Sunway Artessa | MS. ONG LI YING | Technical Colloquium |
25/08/2022 | Ground Treatment at Lingkaran Cassia Timur | MR. NG WEI HAN | Technical Colloquium |
01/09/2022 | Deep Foundation + Point Load Test | DR. GUE CHANG YE | Training Colloquium |
08/09/2022 | Wave Screen for Marina (Ideal GIM) | MS. JESSIE TIONG KUNG YEN | Technical Colloquium |
15/09/2022 | RS Wall Construction at Pasir Gudang Spurline | MR. CHEANG YEE | Technical Colloquium |
22/09/2022 | Grout Treatment at Batu Kawan, Penang | MR. TEO YOW YANG | Technical Colloquium |
29/09/2022 | Proposed Commercial Development for Mercedes Benz at Bandar Parkland, Klang, Selangor. | MS. LAW CHIA WEN | Technical Colloquium |
04/10/2022 | Static Pile Load Test | IR. LEEÂ YAPÂ CHONG, JOHN | Training Colloquium |
06/10/2022 | Dam Inspection (Tasik Subang Dam) | MS. LOW YEE HWA | Technical Colloquium |
13/10/2022 | Settlement Monitoring of Bandar Bukit Raja Phase R12B | MS. KWAN HUI YEE | Technical Colloquium |
20/10/2022 | Retaining Wall Design for Proposed Development at Bukit Nanas | MS. BONNIE LAU | Technical Colloquium |
27/10/2020 | Piled Raft Foundation of Terrace Houses Kampar, Perak | MR. ANG JEN SHEN | Technical Colloquium |
03/11/2022 | High Strain Dynamic Pile Test | IR. DARRYL FONG CHEW CHUNG | Training Colloquium |
10/11/2022 | Dam Inspection (Sg Langat Dam) | MR. CHIA YU HUAT | Technical Colloquium |
17/11/2022 | Mainline Wall Design at Double Track Kempas Depot | MR. CH’NG WEI EN | Technical Colloquium |
24/11/2022 | Remedial Work for Landslide in Ulu Tinggit, Selangor | MR. LENG YEE HUI | Technical Colloquium |
01/12/2022 | Investigation of the Causes of Sinkhole in Aspira Park, Johor | MR. CHEAH BIN YUI, JOSH | Technical Colloquium |
08/12/2022 | Tunnel Strengthening Work for Pergau Main Aqueduct | MR. NEOH XIAO BINN | Technical Colloquium |
15/12/2022 | Foundation System at Bukit Jambul, Penang | MS. ANG JIA EN | Technical Colloquium |
22/12/2022 | Hill Site Development At JIA Melawati | MR. TANG MAN CHUN | Technical Colloquium |
Date | Title Of Talks | Name Of Staff | Colloquium Type |
07/01/2021 | Performance of Large Diameter Bored Piles in Sedimentary and Metamorphic Rock Formations | IR. JASON LIM AING HO | Technical Colloquium |
12/01/2021 | Retaining Structure | IR. LIANG YIT CHUNG, STEVE | Training Colloquium |
14/01/2021 | Review of Penang South Reclamation-Island A | IR. LOW CHEE LEONG | Technical Colloquium |
19/01/2021 | Introduction to ABMS and MACC Act 2009 | IR. CHOW CHEE MENG | Technical Colloquium |
21/01/2021 | Senstivity Study on Pile Length Respond for Piled Strip Raft System | IR. DR. WONG SHIAO YUN | Technical Colloquium |
26/01/2021 | Myth: Structural Capacity Should Always Be Adopted When Pile Is Set | IR. TING DENG ING | Technical Colloquium |
04/02/2021 | Introduction to Plaxis Finite Element Analyses | IR. HONG BOON KHANG, ASHTON | Training Colloquium |
09/02/2021 | Temporary Works for TBM Tunnelling | IR. KOO KUAN SENG | Technical Colloquium |
18/02/2021 | Challenges and Risk Control for Foundation in Limestone Formation | IR. HO SHU FENG | Technical Colloquium |
25/02/2021 | Essence of Effective Technical Presentation | IR. DR. GUE CHANG SHIN | Technical Colloquium |
04/03/2021 | Summary for the short course on Principles and Practical of Engineering Geology and Rock Engineering | MR. TIONG CHIONG NGU / MR. CHEE FONG WAH | Training Colloquium |
11/03/2021 | Case Study of Bored Pile Quality Issues | IR. KANG YEE PING | Technical Colloquium |
18/03/2021 | Foundation Design and Construction of Multistorey Car Park Building Taman Koperasi | IR. NOOR AZLINA BTE AZHARI | Technical Colloquium |
25/03/2021 | Green and Sustainable Engineering Measures for Landslide Mitigation | IR. KWANG KIM LUP | Technical Colloquium |
01/04/2021 | Introduction to PDS Workshop | IR. TEI CHIEW LING | Training Colloquium |
08/04/2021 | Basement Excavation and Construction at Agile Bukit Bintang | MR. TEO LII BINN | Technical Colloquium |
15/04/2021 | Proposed Development at Bukit Jambul, Penang | IR. MOSES HON CHA YAT | Technical Colloquium |
22/04/2021 | Foundation Design for Sunway Velocity 2. | IR. NOR AZRA BT AB. WAHAB | Technical Colloquium |
27/04/2021 | Foundation Design for One Equine | MR. ALAN YAP VOON CHUAN | Technical Colloquium |
06/05/2021 | Introduction to Plaxis 3D | IR. SOH TEK PENG | Training Colloquium |
11/05/2021 | Foundation Design for Mixed Develoepment at CP2, Bandar Sunway | MR. DESMOND TEH KOK LOONG | Technical Colloquium |
20/05/2021 | Rock Tunnel Rehabilitation Design Using Forepole and Steel Arches | DR. GUE CHANG YE | Technical Colloquium |
27/05/2021 | Proposed Development at Batu Kawan | MS. TAN PEI YING | Technical Colloquium |
03/06/2021 | Investigation for Slope Failure & Remedial Works, Samalaju, Sarawak | MS. CHIN YU LIN, ELYNN | Technical Colloquium |
10/06/2021 | Incompliance of RC Wall Details and Rectification Works | MR. DERRICK TAN WEE KEONG | Technical Colloquium |
17/06/2021 | Foam Drilling | MR. OOI QI WEI | Technical Colloquium |
24/06/2021 | Geotechnical Review on Stability of RS Wall and Safety of Swimming Pool at Idamansara | IR. TEH WAI SAN | Technical Colloquium |
01/07/2021 | Earthworks Compaction | MS. KHOO LAI PENG | Training Colloquium |
06/07/2021 | Introduction to ISO Upgrading 9001:2015 / Procedure Risks & Opportunities Assessment | IR. DR. WONG SHIAO YUN | ISO Colloquium |
08/07/2021 | Design and Construction of PVD with Temporary Surcharge as Ground Treatment over Soft Clay in Batu Kawan, Penang, Malaysia. | MR. JOACHIM GERARD BOK | Technical Colloquium |
15/07/2021 | Lesson Learnt at Phase 4, Genting Ion Delemen | MR. KHAIRUL IZHAR BIN KASIM | Technical Colloquium |
22/07/2021 | Tilted Spun Pile at Jalan Cecil, Penang. | MS. ONG LI YING | Technical Colloquium |
29/07/2021 | Lesson Learnt from Underpining Works at Taman Pelangi Semenyih | IR. DR. PUSPANATHAN SUBRAMANIAM | Technical Colloquium |
05/08/2021 | Settlement Analysis & Consolidation | MR. CHEE FONG WAH | Training Colloquium |
12/08/2021 | Piled Embankment at Lingkaran Cassia Barat, Batu Kawan | MR. NG WEI HAN | Technical Colloquium |
19/08/2021 | Iskandar Malaysia Bus Rapid Transit (IMBRT) | IR. LEEÂ YAPÂ CHONG, JOHN | Technical Colloquium |
26/08/2021 | Taman Equine Plot 2 | MS. JESSIE TIONG KUNG YEN | Technical Colloquium |
02/09/2021 | Ground Improvement | IR. ONG KAHÂ PENG | Training Colloquium |
09/09/2021 | Pasir Gudang Spurline Construction | MR. CHEANG YEE | Technical Colloquium |
14/09/2021 | Kempas Depot Foundation Design | MR. TEO YOW YANG | Technical Colloquium |
23/09/2021 | Proposed Foundation System for Sky Vogue, Taman Danau Desa | MS. LAW CHIA WEN | Technical Colloquium |
30/09/2021 | Ground Settlement Review for Phase 1A (Zircona), Alam Impian | MS. LOW YEE HWA | Technical Colloquium |
07/10/2021 | Shallow Foundation | MS. CHONG SHIN YEE | Training Colloquium |
14/10/2021 | Sinkhole investigation for TU6 | MS. KWAN HUI YEE | Technical Colloquium |
21/10/2021 | Lessons Learnt from Deep Excavations in Soft Clay | IR. DARRYL FONG CHEW CHUNG | Technical Colloquium |
28/10/2021 | Foundation Design for Proposed Development at Bukit Nanas | MS. BONNIE LAU | Technical Colloquium |
02/11/2021 | Cone Penetration Test (CPU/CPTU) | MS. LIM YOK CHIN | Training Colloquium |
11/11/2021 | Geotechnical Design for Mine Pit | MR. CHIA YU HUAT | Technical Colloquium |
18/11/2021 | Foundation Design for Solaris Plot B | MR. CH’NG WEI EN | Technical Colloquium |
25/11/2021 | Foundation Design for Sunway Valley City, Penang | MR. LENG YEE HUI | Technical Colloquium |
02/12/2021 | Earth Retaining Structure Design for Sunway CP2 | MR. ANG JEN SHEN | Technical Colloquium |
09/12/2021 | Drone Photogrammetry Survey on Failed Slope at Bersia HEP, Grik, Perak | MR. CHEAH BIN YUI | Technical Colloquium |
16/12/2021 | Pier-Column Design for Sunway Medical Centre, Kota Damansara | MR. NEOH XIAO BINN | Technical Colloquium |
23/12/2021 | Proposed Development at Bukit Jambul, Penang | MS. ANG JIA EN | Technical Colloquium |
Date | Title Of Talks | Name Of Staff |
Colloquium Type
|
02/01/2020 | Soil Slope Stability | IR. JASON LIM AING HO | Training Colloquium |
09/01/2020 | Underpinning Works for Kompleks Budaya Kraf | IR. LOW CHEE LEONG | Technical Colloquium |
16/01/2020 | Investigation on Ground Settlement at NAHARA, Bandar Bukit Raja | IR. DR. WONG SHIAO YUN | Technical Colloquium |
23/01/2020 | Tower Foundation Design Concept | IR. TING DENG ING | Technical Colloquium |
04/02/2020 | Investigation on distressed slope and wall | IR. KOO KUAN SENG | Technical Colloquium |
06/02/2020 | Rock Slope Stability | MS. FARAH LIYANA BINTI AZMAN | Training Colloquium |
13/02/2020 | Lessons Learnt on The Rail Settlement at Iron Ore Plant | IR. HO SHU FENG | Technical Colloquium |
20/02/2020 | Pergau Tunnel Mapping for Root Cause Finding | MR. TIONG CHIONG NGU, PHILIP | Technical Colloquium |
27/02/2020 | Settlement Issues at KLIA2 | IR. DR. GUE CHANG SHIN | Technical Colloquium |
05/03/2020 | Soil Nail Design | MS. KANG YEE PING | Training Colloquium |
12/03/2020 | Lesson learnt from hillsite project (KYS international School) | MS. TEI CHIEW LING | Technical Colloquium |
19/03/2020 | scm construction issues | IR. NOOR AZLINA BTE AZHARI | Technical Colloquium |
26/03/2020 | Design of ERSS for DEWP | IR. LIANG YIT CHUNG, STEVE | Technical Colloquium |
02/04/2020 | Pull Out Test for Soil Nail | IR. KWANG KIM LUP | Training Colloquium |
09/04/2020 | Queensbay Waterfront Development | MS. ONG KAHÂ PENG | Technical Colloquium |
16/04/2020 | Deep Excvation in KL Limestone Formation for Chan Sow Lin Station of The Malaysia KVMRT SSP Line | IR. SOH TEK PENG | Technical Colloquium |
23/04/2020 | Engineers’ Roles on Guidelines on Occupational Safety and Health in Construction Industry (Management) (OSHCIM) | MS. KHOO LAI PENG | Technical Colloquium |
30/04/2020 | Investigation of Pile Deviation at Batu Kawan | MR. CHEE FONG WAH | Technical Colloquium |
05/05/2020 | Vane Shear Test + Standard Penetration Test & Mackintosh Test + Permeability Test & Seepage | MR. TEO LII BINN | Training Colloquium |
14/05/2020 | Multibay Development (Constuction Issue) | MS. LIM YOK CHIN | Technical Colloquium |
21/05/2020 | Reinforced Concrete Wall Integrated with Drain | MS. CHONG SHIN YEE | Technical Colloquium |
28/05/2020 | Proposed Development at Lebuh Bukit Jambul, Penang | MR. MOSES HON CHA YAT | Technical Colloquium |
04/06/2020 | Residential Development for Allevia, Mont Kiara | MR. LOW YOONG LAM, RYAN | Technical Colloquium |
11/06/2020 | Shallow Foundation for Terrace, Emerald Hills | MS. NOR AZRA BT AB. WAHAB | Technical Colloquium |
18/06/2020 | RC Wall Collapse at Kota Kemuning | MR. ALAN YAP VOON CHUAN | Technical Colloquium |
25/06/2020 | Sunway CP2 | MR. DESMOND TEH KOK LOONG | Technical Colloquium |
02/07/2020 | Deep Foundation + Point Load Test | DR. GUE CHANG YE | Training Colloquium |
09/07/2020 | Introduction to ISO Upgrading 9001:2015 / Procedure Risks & Opportunities Assessment | IR. DR. WONG SHIAO YUN | ISO Colloquium |
09/07/2020 | COMO – FOUNDATION | MS. TAN PEI YING | Technical Colloquium |
16/07/2020 | Sunway Belfield – Buttress Wall | MS. CHIN YU LIN, ELYNN | Technical Colloquium |
23/07/2020 | Reclamation Works at Penang World City | MR. DERRICK TAN WEE KEONG | Technical Colloquium |
30/07/2020 | Fiber-Reinforced Polymer (FRP) Design | MR. OOI QI WEI | Technical Colloquium |
06/08/2020 | Piled Raft Analysis | IR. TEH WAI SAN | Training Colloquium |
13/08/2020 | Reclamation at Southern Penang | MS. YONG HUI YEN | Technical Colloquium |
18/08/2020 | Solaris Park Plot A | MR. JOACHIM GERARD BOK | Technical Colloquium |
27/08/2020 | Foundation at KMP5 | MR. KHAIRUL IZHAR BIN KASIM | Technical Colloquium |
03/09/2020 | Training for SAFE | IR. DR.PUSPANATHAN SUBRAMANIAM | Training Colloquium |
10/09/2020 | KYS International School – Construction Issues | MS. ONG LI YING | Technical Colloquium |
17/09/2020 | Ground Treatment for Lingkaran Cassia Barat | MR. NG WEI HAN | Technical Colloquium |
24/09/2020 | Proposed Foundation System for Sunway International School | MR. LAU JIAN NING | Technical Colloquium |
01/10/2002 | Static Pile Load Test | MR. LEEÂ YAPÂ CHONG, JOHN | Training Colloquium |
08/10/2020 | Pile Raft Design for Bitumen Tank at Bintulu | MR. CLEMENT CHONG HAW JIUN | Technical Colloquium |
15/10/2020 | Preliminary Foundation Design for Pedestrian Bridge at Sunway Carnival Mall | MR. TAN CHIN GIAP | Technical Colloquium |
22/10/2020 | Interpinning Design for Kompleks Budaya Kraf | MS. JESSIE TIONG KUNG YEN | Technical Colloquium |
27/10/2020 | Multibay Development (Constuction Issue)` | MR. LEE YONG KIANG | Technical Colloquium |
05/11/2020 | High Strain Dynamic Pile Test | IR. DARRYL FONG CHEW CHUNG | Training Colloquium |
12/11/2020 | Review on Foundation Design Proposal of Transmission Line (Bunut – Medamit – Lawas) | MR. CHEANG YEE | Technical Colloquium |
19/11/2020 | Skyvogue | MR. LOK LI WEN | Technical Colloquium |
26/11/2020 | Viaduct Foundation Design for Double Track | MR. TEO YOW YANG | Technical Colloquium |
03/12/2020 | Proposed Foundation System for Sunway Jalan Belfield | MS. LAW CHIA WEN | Technical Colloquium |
10/12/2020 | Proposed Foundation for Sunway Carnival Mall | MS. LOW YEE HWA | Technical Colloquium |
17/12/2020 | Proposed Foundation for Sunway Avila | MS. KWAN HUI YEE | Technical Colloquium |
24/12/2020 | Proposed Foundation system for Setia Mayuri | MR.THEN KANG JIN | Technical Colloquium |
Date | Title Of Talks | Name Of Staff |
Colloquium Type
|
3/01/2019 | Procedure for Project Quality Plan (PQP) | MS. NOR AZRA BINTI AB. WAHAB | ISO Colloquium |
15/01/2019 | Vane Shear Test | MR. TEO LII BINN | Training Colloquium |
10/01/2019 | “Thought Exercise” To Be A Better Engineer | IR. DR. TAN YEAN CHIN | Technical Colloquium |
17/01/2019 | Design & Construction of PVD | IR. LEE PEIR TIEN | Technical Colloquium |
22/01/2019 | Point Load Test | MS. LIM YOK CHIN | Training Colloquium |
24/01/2019 | What Is Appropriate Design Approach Of Earthworks In A Rolling Terrain? | IR. LIEW SHAW SHONG | Technical Colloquium |
31/01/2019 | Deflection Criteria for Buildings | IR. CHOW CHEE MENG | Technical Colloquium |
7/02/2019 | Procedure for Design Control | MS. LIM YOK CHIN | ISO Colloquium |
7/02/2019 | Circular Shaft Design Consideration | IR. TEH WAI SAN | Technical Colloquium |
12/02/2019 | Standard Penetration Test & Mackintosh Test | MR. LOW YOONG LAM, RYAN | Training Colloquium |
14/02/2019 | MRTC submission Procedure for Multibay Project | IR. DR. WONG SHIAO YUN | Technical Colloquium |
19/02/2019 | Effects of Tunnelling Under an Existing Tunnel- Part 2 (I&M) | DR. GUE CHANG YE | Technical Colloquium |
21/02/2019 | Upgrading B18 Road | IR. SHAFINA SABARUDDIN | Technical Colloquium |
26/02/2019 | Permeability Test & Seepage | MR. MOSES HON CHA YAT | Training Colloquium |
28/02/2019 | Foundation Review for Taman Kuchai Jaya | IR. NOOR AZLINA BTE AZHARI | Technical Colloquium |
7/03/2019 | Procedure for Quality Records | MS. CHONG SHIN YEE | ISO Colloquium |
7/03/2019 | Design Procedure for Micropile with Lateral Load | IR. TEI CHIEW LING | Technical Colloquium |
12/03/2019 | Earthworks Compaction | MS. KHOO LAI PENG | Training Colloquium |
14/03/2019 | Driven pile – Displacement, Heave & Relaxation problems | IR. TING DENG ING | Technical Colloquium |
19/03/2019 | Effects of Tunnelling Under an Existing Tunnel- Part 3 (Approach) | DR. GUE CHANG YE | Technical Colloquium |
21/03/2019 | Use “LiDAR Survey” Technique in Rock Mapping | MR. TIONG CHIONG NGU, PHILIP | Technical Colloquium |
26/03/2019 | Retaining Structure | MR. LIANG YIT CHUNG, STEVE | Training Colloquium |
28/03/2019 | Piled Strip Raft in Vietnam | IR. DR. PUSPANATHAN SUBRAMANIAM | Technical Colloquium |
4/04/2019 | Introduction to ISO Upgrading 9001:2015 | IR. LEE PEIR TIEN | ISO Colloquium |
4/04/2019 | KVMRT SSP Line Conlay Station (CLYS)- Part 3 | MR. LEE YAP CHONG, JOHN | Technical Colloquium |
9/04/2019 | Piled Raft Analysis | IR. TEH WAI SAN | Training Colloquium |
11/04/2019 | Underground connection to exisitng MRT station at Maluri | IR. KOO KUAN SENG | Technical Colloquium |
18/04/2019 | DEWP Design Brief | MR. LIANG YIT CHUNG, STEVE | Technical Colloquium |
23/04/2019 | Settlement Analysis & Consolidation | MR. CHEE FONG WAH | Training Colloquium |
25/04/2019 | MRT2 Sinkhole Incidents | IR. LOW CHEE LEONG | Technical Colloquium |
2/05/2019 | Procedure for Document and Data Control | MR. TEO LII BINN | ISO Colloquium |
2/05/2019 | Foundation Design for Emerald Hills, Alam Damai | MS. NOR AZRA BINTI AB. WAHAB | Technical Colloquium |
7/05/2019 | Soil Slope Stability | MR. JASON LIM AING HO | Training Colloquium |
9/05/2019 | Design of Viaduct Foundation | IR. DARRYL FONG CHEW CHUNG | Technical Colloquium |
16/05/2019 | I&M for TU7 Tunnelling Works | MS. KANG YEE PING | Technical Colloquium |
21/05/2019 | Rock Slope Stability | MR. TIONG CHIONG NGU, PHILIP | Training Colloquium |
23/05/2019 | Lessons Learnt for Static Pile Load Tests – What Could Go Wrong | MS. KHOO LAI PENG | Technical Colloquium |
30/05/2019 | 2T Gemas Viaduct Foundation | MR. JASON LIM AING HO | Technical Colloquium |
4/06/2019 | Training for SAFE | IR. PUSPANATHAN SUBRAMANIAM | Training Colloquium |
13/06/2019 | Procedure for Internal Quality Audit | MR. MOSES HON CHA YAT | ISO Colloquium |
13/06/2019 | Rock Slope Strengthening Design | MR. SOH TEK PENG | Technical Colloquium |
18/06/2019 | Ground Improvement | MS. ONG KAH PENG | Training Colloquium |
20/06/2019 | Rayston Reclamation | MS. ONG KAH PENG | Technical Colloquium |
27/06/2019 | Proposed Mecedes 3S Centre at Jalan Sungai Besi | MR. LIM BOON LIN, COLIN | Technical Colloquium |
2/07/2019 | Shallow Foundation | MS. CHONG SHIN YEE | Training Colloquium |
4/07/2019 | Procedure for Design, Review, Verification & Validation | MR. LOW YOONG LAM, RYAN | ISO Colloquium |
4/07/2019 | Hydrogeological Assessment On Limestone Quarry | MR. CHEE FONG WAH | Technical Colloquium |
11/07/2019 | Sunway Avila – Foundation | IR. KWANG KIM LUP | Technical Colloquium |
16/07/2019 | Cone Penetration Test (CPU/CPTU) | MR. LIM BOON LIN, COLIN | Training Colloquium |
18/07/2019 | Industry 4.0 – On General & Engineering Consultancy | DATO’ IR. DR. GUE SEE SEW | Technical Colloquium |
25/07/2019 | Reinforced Concrete Wall Integrated with Drain | MS. CHONG SHIN YEE | Technical Colloquium |
30/07/2019 | Introduction to Plaxis 3D | MR. SOH TEK PENG | Training Colloquium |
01/08/2019 | Procedure for Product Identification and Traceability | MR. YAP VOON CHUAN, ALAN | ISO Colloquium |
1/08/2019 | L3A Bukit Jelutong, Shah Alam | MS. LIM YOK CHIN | Technical Colloquium |
6/08/2019 | Static Pile Load Test | MR. LEE YAP CHONG, JOHN | Training Colloquium |
8/08/2019 | Basement Excavation for Agile Development | MR. TEO LII BINN | Technical Colloquium |
15/08/2019 | Proposed Development PJ S13 | MR. MOSES HON CHA YAT | Technical Colloquium |
20/08/2019 | Deep Foundation | DR. GUE CHANG YE | Training Colloquium |
22/08/2019 | Vanke Development | MR. LOW YOONG LAM, RYAN | Technical Colloquium |
29/08/2019 | Wellington Plot 3 Foundation | MR. YAP VOON CHUAN, ALAN | Technical Colloquium |
3/09/2019 | High Strain Dynamic Pile Test | IR. DARRYL FONG CHEW CHUNG | Training Colloquium |
5/09/2019 | Procedure for Client Feedback | MR. TEH KOK LOONG, DESMOND | ISO Colloquium |
5/09/2019 | Melaka Gateway – Reclamation | MS. TAN PEI YING | Technical Colloquium |
12/09/2019 | Pulau Jerejak Bridge – Piled Slab Design | MR. TEH KOK LOONG, DESMOND | Technical Colloquium |
17/09/2019 | Pull Out Test for Soil Nail | IR. KWANG KIM LUP | Training Colloquium |
19/09/2019 | KVMRT SSP Line Chan Sow Lin Station – Ground Anchor | MS. CHIN YU LIN, ELAINE | Technical Colloquium |
26/09/2019 | Slope Slip Incident at Astoria | MR. TAN WEE KEONG, DERRICK | Technical Colloquium |
1/10/2019 | Introduction to Plaxis Finite Element Analyses | IR. LOW CHEE LEONG | Training Colloquium |
3/10/2019 | ISO 9001 Overview | MS. TAN PEI YING | ISO Colloquium |
3/10/2019 | Mine Pit Design | MR. OOI QI WEI | Technical Colloquium |
10/10/2019 | Sunway Velocity 2-Foundation | MS. VANESSA TAN WEI JING | Technical Colloquium |
15/10/2019 | Introduction to PDS Workshop | MS. TEI CHIEW LING | Training Colloquium |
22/10/2019 | Infra & Built for Sg Pencala | MS. YONG HUI YEN | Technical Colloquium |
24/10/2019 | KDU Penang at Batu Kawan Foundation of Building | MR. JOACHIM GERARD BOK | Technical Colloquium |
29/10/2019 | Soil Nail Design | MS. KANG YEE PING | Training Colloquium |
31/10/2019 | Ground Treatment Design For T12 | MR. KHAIRUL IZHAR BIN KASIM | Technical Colloquium |
7/11/2019 | Procedure for Site Supervision Plan | MS. CHIN YU LIN, ELAINE | ISO Colloquium |
7/11/2019 | Sunway Kelana Jaya | MS. ONG LI YING | Technical Colloquium |
19/11/2019 | Kajang 2 Precinct 2 (Southern) Preliminary Design | MS. JESSIE TIONG KUNG YEN | Technical Colloquium |
21/11/2019 | Preliminary Design for Tower MJM56 | MR. CLEMENT CHONG HAW JIUN | Technical Colloquium |
28/11/2019 | Pulau Jerejak Bridge – Foundation Design | MR. TAN CHIN GIAP | Technical Colloquium |
5/12/2019 | Procedure on Role of Checker & Reviewer | MR. TAN WEE KEONG, DERRICK | ISO Colloquium |
5/12/2019 | Development at Bukit Nanas, KL | IR. HO SHU FENG | Technical Colloquium |
10/12/2019 | KL Midtown – Preliminary Design | MR. LAU JIAN NING | Technical Colloquium |
12/12/2019 | Sarawak Transmission Tower MJB15 – Preliminary Design | MR. LEE YONG KIANG, JORDAN | Technical Colloquium |
19/12/2019 | Agile Tropicana Bukit Bintang – Foundation Design | MR. CHEANG YEE | Technical Colloquium |
24/12/2019 | ECRL Preliminary Design – Viaduct Foundation | MR. TAY WEI SONG | Technical Colloquium |
Date | Title Of Talks |
Name Of Staff
|
04/01/2018 | How to Value add to yourself & G&P – Way to Top Management |
IR. DR. TAN YEAN CHIN
|
09/01/2018 | Procedure for Project Quality Plan (PQP) | MS. ONG KAH PENG |
09/01/2018 | Vane Shear Test | MS. TEH WAI SAN |
11/01/2018 | Retaining Wall Collapse – Kajang East | IR. LEE PEIR TIEN |
18/01/2018 | Investigating and Mitigating Measures to Peat Five Sinkholes in Limestone Formation and Boulder Fall | IR. LIEW SHAW SHONG |
23/01/2018 | Point Load Test | MS. LIM YOK CHIN |
06/02/2018 | Self-Advancement | IR. PUSPANATHAN SUBRAMANIAM |
08/02/2018 | Procedure for Design Control | MS. KHOO LAI PENG |
13/02/2018 | Standard Penetration Test & Mackintosh Test | MR. TEO LII BINN |
20/02/2018 | Permeability Test & Seepage | MR. MOSES HON CHA YAT |
22/02/2018 | Buiding Impact Assessment due to Tunnelling Works | MS. TEH WAI SAN |
01/03/2018 | Procedure for Quality Records | MR. SOH TEK PENG |
01/03/2018 | Pile Foundation Review for TR Residence | IR. DR. WONG SHIAO YUN |
06/03/2018 | Earthworks Compaction | MS. KHOO LAI PENG |
12/03/2018 | Geotechnical Aspects of High Speed Rail | IR. CHOW CHEE MENG |
15/03/2018 | Investigation of Foundation for Respiratory Building | IR. NOOR AZLINA BTE AZHARI |
21/03/2018 | Geotechnical Feasibility Study at Kepong area | IR. SHAFINA SABARUDDIN |
23/03/2018 | Retaining Structure | MR. LIANG YIT CHUNG, STEVE |
22/03/2018 | Development at Penang Turf Club | MS. TEI CHIEW LING |
20/03/2018 | Retaining Structure | MR. LIANG YIT CHUNG, STEVE |
26/03/2018 | Buiding Impact Assessment due to Tunnelling Works | MS. TEH WAI SAN |
29/03/2018 | CIU-Test for Hard Material | IR. TING DENG ING |
03/04/2018 | Piled Raft Analysis | MR. DARRELL CHOONG THIAM CHYE |
05/04/2018 | Introduction to ISO Standard | MR. LIM BOON LIN, COLIN |
12/04/2018 | Understanding Soil Description follow BS Standard | MR. TIONG CHIONG NGU, PHILIP |
17/04/2018 | Settlement Analysis & Consolidation | MR. CHEE FONG WAH |
19/04/2018 | Alternative Underpinning Work | IR. PUSPANATHAN SUBRAMANIAM |
26/04/2018 | KVMRT- Conlay Station | MR. LEE YAP CHONG, JOHN |
02/05/2017 | Characterisation of Soils for Engineering Purposes | IR. CHOW CHEE MENG |
03/05/2018 | Procedure for Document and Data Control | MR. DARRELL CHOONG THIAM CHYE |
10/05/2018 | MRT2 | IR. KOO KUAN SENG |
15/05/2018 | Soil Slope Stability | MR. JASON LIM AING HO |
17/05/2018 | MRT Shaft Portal | MR. LIANG YIT CHUNG, STEVE |
24/05/2018 | Review of BBCC Development | IR. LOW CHEE LEONG |
30/05/2018 | Rock Slope Stability | MR. TIONG CHIONG NGU, PHILIP |
31/05/2018 | Foundation Design for Emerald Hills | MS. NOR AZRA BINTI AB. WAHAB |
07/06/2018 | Procedure for Internal Quality Audit | MR. CHEE FONG WAH |
12/06/2018 | Design of Retaining Wall and Support Systems for Deep Basement Construction | IR. CHOW CHEE MENG |
14/06/2018 | Geotechnical Review of Kajang Boulevard 2 | IR. DARRYL FONG CHEW CHUNG |
21/06/2018 | COMO Residensi Development | MS. KANG YEE PENG |
26/06/2018 | Training for SAFE | IR. PUSPANATHAN SUBRAMANIAM |
28/06/2018 | Slope Buffer Requirement at Hillsite Development | MS. KHOO LAI PENG |
05/07/2018 | Procedure for Design, Review, Verification & Validation | MR. KWANG KIM LUP |
10/07/2018 | Ground Improvement | MS. ONG KAH PENG |
12/07/2018 | Review of Collapsed Fence Wall at Lot 3654 Penang. | MR. JASON LIM AING HO |
19/07/2018 | Design of Deep Soil Mixing Wall | MR. SOH TEK PENG |
24/07/2018 | Shallow Foundation | MS. CHONG SHIN YEE |
26/07/2018 | Proposed Development at Queensbay Waterfront | MS. ONG KAH PENG |
02/08/2018 | Procedure for Product Identification and Traceability | MS. CHONG SHIN YEE |
07/08/2018 | Cone Penetration Test (CPU/CPTU) | MR. LIM BOON LIN, COLIN |
09/08/2018 | SKY Vogue Danau Desa | MR. LIM BOON LIN, COLIN |
16/08/2018 | AEON Maluri Basement Excavation | MR. CHEE FONG WAH |
21/08/2018 | Introduction to Plaxis 3D | MR. SOH TEK PENG |
23/08/2018 | Design Construction Retaining Structure | MR. DARRELL CHOONG THIAM CHYE |
30/08/2018 | Proposed Development at Teluk Kumbar | MR. KWANG KIM LUP |
04/09/2018 | Static Pile Load Test | MR. LEE YAP CHONG, JOHN |
ISO Colloquium | |
Training Colloquium | |
Technical Colloquium | |
Geologist Colloquium |
Date | Title Of Talks |
Name Of Staff
|
05/01/2017 | Pull Out Test for Soil Nail |
IR. KOO KUAN SENG
|
10/01/2017 | Procedure for Project Quality Plan (PQP) |
MS. KANG YEE PING
|
11/01/2017 | Remedial Works at Borneo highlands |
MS. TEH WAI SAN
|
12/01/2017 | Geotechnical Design for Bridge Underpass at Nilai Impian 2 |
MS. ATIQAH BINTI AZMI
|
17/01/2017 | Alternative Foundation Design for Pandan Lake Club |
IR. LEE PEIR TIEN
|
19/01/2017 | Procedure for Design Control |
MR. DARRELL CHOONG THIAM CHYE
|
23/01/2017 | Knowledge Management & Innovation with a Passion |
IR. LIEW SHAW SHONG
|
08/02/2017 | Proposed Foundation Design for RC1 |
MS. TEH WAI SAN
|
13/02/2017 | Comparison BS vs EC7 for Driven and Bored Pile Foundation Side Axias Compression Loads |
DATO’ IR. DR. GUE SEE SEW
|
22/02/2017 | Investigation of Soil Nailed Slope Distress at Fill Ground & Remedial Solutions |
MR. KWANG KIM LUP
|
23/02/2017 | Procedure for Quality Records |
IR. SHAFINA SABARUDDIN
|
14/03/2017 | Earthwork Compaction |
MS. KHOO LAI PENG
|
14/03/2017 | Highrise on Limestone |
MS. KHOO LAI PENG
|
17/03/2017 | Point Load Test |
MS. NURSYAKIRAH BINTI ISMAILÂ AZHARI
|
22/03/2017 | JPS Pump Station |
MS. KANG YEE PENG
|
23/03/2017 | RC Wall |
PN. NOOR AZLINA BTE AZHARI
|
13/04/2017 | Retaining Structure |
IR. TING DENG ING
|
25/04/2017 | Introduction to ISO Standard |
IR. DR. GUE SEE SEW
|
27/04/2017 | Procedure for Document and Data Control |
IR. TING DENG ING
|
04/05/2017 | Hill Site Development |
MR. JASON LIM AING HO
|
09/05/2017 | KVMRT SSP Link Conlay Station |
MR. LEE YAP CHONG, JOHN
|
16/05/2017 | Standard Penetration Test & Mackintosh Test |
IR. CHOW CHEE MENG
|
18/05/2017 | Design Review on Raft Foundation for MED Plants at Saudi Arabia |
IR. CHOW CHEE MENG
|
24/05/2017 | Permeability Test & Seepage |
MS. TEI CHIEW LING
|
26/05/2017 | Rock Slope Stability |
MR. LEE YAP CHONG, JOHN
|
30/05/2017 | Investigation and Remedial Works of Jalan Plumbum Houses |
MR. LIANG YIT CHUNG, STEVE
|
31/05/2017 | Drawbrigde |
DR. WONG SHIAO YUN
|
06/06/2017 | Independent Review of Phase 1 of TRX |
IR. LOW CHEE LEONG /
IR. DR. WONG SHIAO YUN |
15/06/2017 | Proposed Development MK27 |
MR. TIONG CHIONG NGU, PHILIP / EN. CHE KU MOHD WAQIYUDDIN BIN CHE KU BESAR
|
20/06/2017 | Soil Slope Stability |
IR. LOW CHEE LEONG
|
22/06/2017 | Soil Slope Stability |
IR. KOO KUAN SENG
|
29/06/2017 | Procedure for Design, Review, Verification & Validation |
IR. DARRYL FONG CHEW CHUNG
|
05/07/2017 | Procedure for Internal Quality Audit |
MS. KANG YEE PENG
|
06/07/2017 | Foundation Design for Water Tank |
MR. JASON LIM AING HO
|
12/07/2017 | Introduction to Critical State Soil Mechanics (Part 1) |
MS. ONG KAH PENG
|
11/07/2017 | Procedure for Internal Quality Audit |
MR. LIANG YIT CHUNG, STEVE
|
12/07/2017 | Training for SAFE |
IR. PUSPANATHAN SUBRAMANIAM
|
13/07/2017 | Earthwork Replanning Design |
MR. LIANG YIT CHUNG, STEVE
|
18/07/2017 | Settlement Analysis & Consolidation |
MS. KHOO LAI PENG
|
19/07/2017 | Landslide and Debris Flow Hazard |
IR. LEE PEIR TIEN
|
20/07/2017 | KL Metropolis |
MR. TIONG CHIONG NGU, PHILIP
|
25/07/2017 | Ground Improvement |
MR. JASON LIM AING HO |
27/07/2017 | Sunway Kelana Jaya Development |
MS. ONG KAH PENG
|
01/08/2017 | Transaction Piled & Embankment |
MS. ONG KAH PENG
|
03/08/2017 | Procedure for Client Feedback |
IR. PUSPANATHAN SUBRAMANIAM |
03/08/2017 | Queen’s Bay Waterfront Reclamation Work |
MR. SOH TEK PENG
|
07/08/2017 | Alam Damai Mix Development |
IR. CHOW CHEE MENG |
08/08/2017 | Shallow Foundation |
MS. NG LEANG YEOW
|
14/08/2017 | Design of Retaining Wall and Support Systems for Deep Basement Construction |
MR. DRRELL CHOONG THIAM CHYE
|
15/08/2017 | Piled Raft Analysis |
MR. LIM BOON LIN, COLIN
|
17/08/2017 | Dry Dock |
MR. LIM BOON LIN, COLIN
|
22/08/2017 | Cone Penetration Test (CPU/CPTU) |
MR. CHEE FONG WAH
|
24/08/2017 | Feasibility Study for 4 Land Adjacent to KLIA |
MS. TEH WAI SAN
|
28/08/2017 | Agile Development |
MR. GU KOK KIN
|
30/08/2017 | Retaining Wall Design for Maju K.L |
DR. WONG SHIAO YUN
|
07/09/2017 | Procedure for Product Identification and Traceability |
MR. DRRELL CHOONG THIAM CHYE
|
12/09/2017 | Introduction to Plaxis 3D |
MR. LIM BOON LIN, COLIN
|
14/09/2017 | Proposed Development at Sunway CP1 |
MR. SOH TEK PENG |
20/09/2017 | Independent review of CBP Wall for Bukit Bintang Cluster A |
MR. KWANG KIM LUP
|
26/09/2017 | Static Pile Load Test |
MS. LIM YOK CHIN
|
28/09/2017 | RC Wall Intergrated with Drain |
MR. LEE YAP CHONG, JOHN
|
05/10/2017 | ISO 9001 Overview |
MS. CHONG SHIN YEE
|
10/10/2017 | Deep Foundation |
MR. DRRELL CHOONG THIAM CHYE
|
24/10/2017 | Penang Times Square Phase 3 Foundation and Excavation |
MR. KWANG KIM LUP |
19/10/2017 | Vibration Limits and Reference Standards |
MR. TEO LII BINN |
26/10/2017 | High Strain Dynamic Pile Test |
MS. ATIQAH BINTI AZMI |
02/11/2017 | Substructure Work for Prima Phase 1 |
IR. DARRYL FONG CHEW CHUNG |
09/11/2017 | Procedure for Site Supervision Plan |
MS. NURSYAKIRAH BINTI ISMAIL
|
14/11/2017 | Construction Works at Maju Kuala Lumpur |
MR. CHEE FONG WAH |
16/11/2017 | Pull Out Test for Soil Nail |
MR. MOSES HON CHA YAT |
23/11/2017 | K.L 118 Bored Pile Review |
IR. KOO KUAN SENG |
28/11/2017 | Foundation at Lot 1906, CK3, Mont’ Kiara |
MR. LOW YOONG LAM, RYAN
|
30/11/2017 | Introduction to Plaxis Finite Element Analyses |
MR. YAP VOON CHUAN, ALAN
|
07/12/2017 | Geotechnical Assessment at Lafarge Rawang Quarry Site |
MR. TEH KOK LOONG, DESMOND
|
12/12/2017 | Procedure on Role of Checker & Reviewer |
PN. NOOR AZLINA BTE AZHARI / MS. TEI CHIEW LING
|
14/12/2017 | Introduction to PDS Workshop |
MS. TAN PEI YING
|
21/12/2017 | Remedial Work at Skyville Puchong |
MS. CHIN YU LIN, ELAINE |
28/12/2017 | Bukit Bintang Cluster C |
MR. TAN WEE KEONG, DERRICK
|
ISO Colloquium | |
Training Colloquium | |
Technical Colloquium | |
Geologist Colloquium |
Date | Title Of Talks | Name Of Staff |
07/01/2016 | Procedure for PQP | MR. LAM YOKE WOH |
12/01/2016 | Vane Shear Test | MS. TEH WAI SAN |
13/01/2016 | How To Be A Good Engineer | IR. TAN YEAN CHIN |
04/02/2016 | Procedure for Design Control | MS. TEI WAI SAN |
17/02/2016 | Standard Penetration Test & Mackintosh Test | MR. STEVE LIANG |
22/02/2016 | Automated Recording System for Jack-In Pile | IR. LIEW SHAW SHONG |
23/02/2016 | Earthwork Compaction | MS. KHOO LAI PENG |
24/02/2016 | Design Procedure for Pile Foundation | IR. DR. WONG SHIAO YUN |
02/03/2016 | G&P Point System-Zero-in Zero-out | DATO’ IR. DR. GUE SEE SEW |
03/03/2016 | Procedure for Quality Records | MS. KANG YEE PING |
10/03/2016 | Geotechnical Review at Taman Pelangi Indah | IR. SHAFINA SABARUDDIN |
17/03/2016 | PVD Design for Embankment | IR. LEE PEIR TIEN |
21/03/2016 | Concrete Face Rock Filled Dam | MS. TEH WAI SAN |
29/03/2016 | Permeability Test & Seepage | IR. LOW CHEE LEONG / IR. DR. WONG SHIAO YUN |
30/03/2016 | Point Load Test | MS. KANG YEE PING |
31/03/2016 | Soil Investigation for Sandakan Project | IR. TING DENG ING |
06/04/2016 | Basement & Foundation Construction for Office Retails, Petaling Jaya | IR. CHEAH SIEW WAI |
07/04/2016 | Introduction to ISO Standard | MS. KHOO LAI PENG |
12/04/2016 | Collapsed RC Wall at HillPark Shah Alam | IR. DR. WONG SHIAO YUN |
21/04/2016 | MSPR 8 Construction of Foundation | PN. NOOR AZLINA BTE AZHARI |
28/04/2016 | Retaining Structure | IR. TING DENG ING |
05/05/2016 | Procedure for Document and Data Control | MR. JASON LIM AING HO |
10/05/2016 | Small Strain Stiffness of Soils and Its Numerical Consequences | IR. CHOW CHEE MENG |
17/05/2016 | Geological Strength Index (GSI) | MR. TIONG CHIONG NGU, PHILIP |
19/05/2016 | Lot 1887 @Mon’t Kiara | MR. LEE YAP CHONG, JOHN |
25/05/2016 | Wellington Development | MS. TEI CHIEW LING |
09/06/2016 | Procedure for Internal Quality Audit | MS. ONG KAH PENG |
15/06/2016 | Foundation and excavation design for Maju Station Hotel, Bandar Tasik Selatan | IR. HO SHU FENG |
21/06/2016 | Characterisation of Soils for Engineering Purposes | IR. CHOW CHEE MENG |
28/06/2016 | Alam Impian Main Drain issues | DR. GUE CHANG SHIN |
12/07/2016 | Procedure for Design, Review, Verification & Validation | MR. LEE YAP CHONG, JOHN |
12/07/2016 | Soil Slope Stability | MR. JASON LIM AING HO |
14/07/2016 | MK22 Construction Issues | IR. LOW CHEE LEONG |
20/07/2016 | Settlement Analysis & Consolidation | IR. LEE PEIR TIEN |
21/07/2016 | Case Histories Hospital Ipoh | MS. NOR AZRA BINTI AB. WAHAB |
26/07/2016 | Rock Slope Stability | MR. TIONG CHIONG NGU, PHILIP / EN. CHE KU MOHD WAQIYUDDIN |
28/07/2016 | Introduction to PVD in Plaxis | IR. PUSPANATHAN SUBRAMANIAM |
09/08/2016 | Design of Retaining Wall and Support Systems for Deep Basement Construction | IR. CHOW CHEE MENG |
11/08/2016 | Viaduct Foundation Design | IR. DARRYL FONG CHEW CHUNG |
22/08/2016 | KDU Batu Kawan | MR. LAM YOKE WOH |
24/08/2016 | Lessons Learned for RS Wall Construction | MS. KHOO LAI PENG |
29/08/2016 | Trainee Presentation | ALL TRAINEES |
01/09/2016 | Procedure for Product Identification and Traceability | PN. NOOR AZLINA BTE AZHARI |
19/09/2016 | Substructure Works for Aria P1, Jalan Tun Razak | MR. LIANG YIT CHUNG, STEVE |
19/09/2016 | Procedure for Client Feedback | MR. LIANG YIT CHUNG, STEVE |
21/09/2016 | Ground Improvement | MR. LAM YOKE WOH |
22/09/2016 | Fishermen Pier-CBP Wall Design | MS. LIM YOK CHIN |
27/09/2016 | Training for SAFE | IR. PUSPANATHAN SUBRAMANIAM |
29/09/2016 | Remedial Works for Slanted Quaywall | MR. SOH TEK PENG |
05/10/2016 | Excavation | IR. KOO KUAN SENG |
13/10/2016 | Cone Penetration Test (CPU/CPTU) | IR. TING DENG ING |
19/10/2016 | PWC Directional Ramp � Piling Obstructions | MR. JASON LIM AING HO |
26/10/2016 | Controlled Rock Blasting | MS. KANG YEE PING |
09/11/2016 | Subsoil Drain Design at Kajang 2 Precinct 2 | MS. CHONG SHIN YEE |
10/11/2016 | Geotechnical Design for Bridge Underpass at Nilai Impian 2 | MR. DARRELL CHOONG THIAM CHYE |
14/11/2016 | RAPID Package 3 | MR. LIM BOON LIN, COLIN |
15/11/2016 | Static Pile Load Test | MR. LEE YAP CHONG, JOHN |
17/11/2016 | Proposed Foundation Design for RC1 | MR. KWANG KIM LUP |
22/11/2016 | Deep Foundation | DR. GUE CHANG SHIN |
23/11/2016 | RIO CITY-Bored Pile Design | MS. ONG KAH PENG |
24/11/2016 | Semenyih Dam Safety Inspection | MR. TEO LII BINN |
28/11/2016 | Procedure for Site Supervision Plan | IR. PUSPANATHAN SUBRAMANIAM |
29/11/2016 | RAPID Phase 2 | MR. CHEE FONG WAH |
30/11/2016 | ISO 9001 Overview | MR. SOH TEK PENG |
30/11/2016 | Introduction to Plaxis 3D | MR. SOH TEK PENG |
01/12/2016 | Procedure on Role of Checker & Reviewer | MR. LIM BOON LIN, COLIN |
06/12/2016 | High Strain Dynamic Pile Test | IR. DARRYL FONG CHEW CHUNG |
08/12/2016 | Remedial Works at Borneo highlands | MS. ATIQAH BINTI AZMI |
13/12/2016 | Pull Out Test for Soil Nail | IR. KOO KUAN SENG |
15/12/2016 | Highrise on Limestone | MS. NURSYAKIRAH BINTI ISMAIL |
20/12/2016 | Introduction to Plaxis Finite Element Analyses | IR. LOW CHEE LEONG |
22/12/2016 | PJ City Phase 2 Development | MR. MOSES HON CHA YAT |
27/12/2016 | Introduction To PDS Workshop | PN. NOOR AZLINA BTE AZHARI / MS. TEI CHIEW LING |
29/12/2016 | Alternative Foundation Design for Pandan Lake Club | MR. LOW YOONG LAM, RYAN |
Note: The above schedule is subject to changes from time to time.
ISO Colloquium | |
Training Colloquium | |
Technical Colloquium | |
Geologist Colloquium |
Date | Title Of Talks | Name Of Staff |
06/01/2015 | Excavatability Assessment via GSI Approach | IR. DR. WONG SHIAO YUN |
13/01/2015 | Vane Shear Test | IR. LEE PEIR TIEN/IR. SHAFINA SABARUDDIN |
15/01/2015 | Common Issues and Myths Remained Unresolved in Geotechnical Pratices | IR. LIEW SHAW SHONG |
20/01/2015 | Procedure for PQP | MS. KANG YEE PING |
22/01/2015 | Small – Strain Stiffness of Soil | IR. CHOW CHEE MENG |
27/01/2015 | Point Load Test | IR. LOH YEE ENG |
05/02/2015 | Procedure for Design Control | MR. LAM YOKE ‘WOH |
11/02/2015 | Standard Penetration Test & Mackintosh Test | IR. LOW CHEE LEONG |
12/02/2015 | Iron Ore Distribution Centre | IR. LEE PEIR TIEN |
24/02/2015 | MSPR 8 Construction of Foundation | MS. NOOR AZLINA BTE AZHARI |
26/02/2015 | Independent Geotechnical Review for Proposed Development at Phase A1-06, Alam Impian | IR. SHAFINA SABARUDDIN |
10/03/2015 | Permeability Test | IR. LOW CHEE LEONG |
12/03/2015 | Earthwork Compaction | IR. CHEAH SIEW WAI |
17/03/2015 | Procedure for Quality Records | MS. TEH WAI SAN |
24/03/2015 | Effective Stress | IR. TAN YEAN CHIN |
31/03/2015 | Ground Treatment for Soft Ground | IR. TAN YEAN CHIN |
01/04/2015 | Reinforced Soil Wall – Design & Construction | IR. CHEAH SIEW WAI |
14/04/2015 | Piling Work at Limestone Area | MS. TEI CHIEW LING |
16/04/2015 | What we need to know about PLAXIS AE? | IR. LOH YEE ENG |
21/04/2015 | Stress in Soil Masses//Stress Path (Part 1 & Part 2) | IR. TAN YEAN CHIN |
23/04/2015 | Introduction to ISO Standard | MR. ASHTON HONG BOON KHANG |
23/04/2015 | Piling Work at Soft Ground Area | IR. TING DENG ING |
08/05/2015 | Geologist Input to Hillsite Development | MR. TIONG CHIONG NGU, PHILIP |
13/05/2015 | Shear Strength | IR. TAN YEAN CHIN |
14/05/2015 | Design and Construction Considerations for Steel Struts in Excavation of KVMRT Project in Malaysia | IR. LOH YEE ENG |
18/05/2015 | Retaining Structure | IR. TING DENG ING |
21/05/2015 | The collapse of the Ramp 2 of the 2nd Penang Bridge – Causes & Lessons Learnt | DATO’ IR. DR. GUE SEE SEW |
25/05/2015 | Procedure for Document and Data Control | MS. KHOO LAI PENG |
28/05/2015 | Preliminary Slope Inspection at Pylon Towers in Bintulu | IR. PUSPANATHAN SUBRAMANIAM |
02/06/2015 | Introduction to Critical State Soil Mechanics (Part 1 & Part 2) | IR. TAN YEAN CHIN |
04/06/2015 | Procedure for Internal Quality Audit | MS. JASON LIM AING HO |
11/06/2015 | Ground settlement issues at Alam Sutera | DR. GUE CHANG SHIN |
16/06/2015 | Permeability & Seepage | IR. DR. WONG SHIAO YUN |
18/06/2015 | Maintained Load Test by Reaction Pile System | MR. LEE YAP CHONG, JOHN |
23/06/2015 | Design and Construction for KT Drawbridge | IR. KOO KUAN SENG |
25/06/2015 | Construction Issues for Proposed Mercedes-Benz Integrated Facilities, Headquarter and Training Centre at Kinrara | IR. HO SHU FENG |
30/06/2015 | Deformability/Consolidation | IR. CHEAH SIEW WAI |
07/07/2015 | Design of RC pile for Project Centralise Office at Nusajaya | MS. NAEMAH BINTI ESA |
09/07/2015 | Procedure for Design, Review, Verification & Validation | MS. ONG KAH PENG |
13/07/2015 | Jack-in Pile Foundation System in Taman Melawati | MR. LIANG YIT CHUNG, STEVE |
14/07/2015 | Characterisation of Soils for Engineering Purposes | IR. CHOW CHEE MENG |
16/07/2015 | Jack-in Pile Fondation System in Limestone Formation (South Quay Ph2, RC8) | IR. DR. WONG SHIAO YUN |
23/07/2015 | Supervision checklist for HSDPT | MS. TEH WAI SAN |
28/07/2015 | Soil Slope Stability | MS. TEI CHIEW LING |
30/07/2015 | Geotechnical Design for Sector B, Parkcity | IR. LOW CHEE LEONG |
06/08/2015 | Procedure for Client Feedback | MR. LEE YAP CHONG, JOHN |
06/08/2015 | Jack-in Pile Foundation System at Rafflesia, Sentul | MS. NOR AZRA BINTI AB. WAHAB |
11/08/2015 | Rock Slope Stability | MR. TIONG CHIONG NGU, PHILIP |
13/08/2015 | Ground Improvement for KDU @ Batu Kawan | MR. LAM YOKE ‘WOH |
20/08/2015 | Design and Construction for Genting Element Project | MR. ASHTON HONG BOON KHANG |
25/08/2015 | Design of Retaining Wall and Support Systems for Deep Basement Construction | IR. CHOW CHEE MENG |
27/08/2015 | Viaduct Foundation Design | IR. DARRYL FONG CHEW CHUNG |
03/09/2015 | Procedure for Product Identification and Traceability | MR. LIANG YIT CHUNG, STEVE |
03/09/2015 | Subsurface Investigation in Limited Heightroom Space | MR. MOHAMAD SAIFUL AZLIE BIN AHMAD |
08/09/2015 | Training for SAFE | IR. PUSPANATHAN SUBRAMANIAM |
10/09/2015 | Geophysical Survey | MS. KANG YEE PING |
17/09/2015 | Construction of RC Retanining Wall | MS. KHOO LAI PENG |
22/09/2015 | Ground Improvement | IR. SHAFINA SABARUDDIN/IR. LEE PEIR TIEN |
23/09/2015 | Penang World City Reclamation – A Brief Overview | MR. JASON LIM AING HO |
01/10/2015 | Proposed Development of Parcel 1A of D’Estuary | MS. ONG KAH PENG |
06/10/2015 | Shallow Foundation | IR. CHOW CHEE MENG |
08/10/2015 | ISO 9001 Overview | MS. NOOR AZLINA BTE AZHARI |
08/10/2015 | Proposed Marina and Waterfront at Teluk Burau, Langkawi | MS. LIM YOK CHIN |
15/10/2015 | Proposed Strengthening Works for Jacking Pile Cap for SK316 | MR. SOH TEK PENG |
20/10/2015 | Cone Penetration Test (CPU/CPTU) | IR. TING DENG ING |
22/10/2015 | Ground Treatment at Batu Kawan | MR. SEAH CHOON SHEAN |
29/10/2015 | Mixed Development at Phase 1 Stage 6 (6.83 acres), Putra Heights | MR. LIM BOON LIN, COLIN |
03/11/2015 | Settlement Analysis | IR. HO SHU FENG |
05/11/2015 | Procedure for Site Supervision Plan | MR. SOH TEK PENG |
05/11/2015 | Integrated RC Wall | MS. CHONG SHIN YEE |
11/11/2015 | Review of Pile Deviation at Fabric Filter for Tanjung Bin | MR. CHEE FONG WAH |
12/11/2015 | Cross-hole Seismic Testing Methods for Determination of Small-Strain Stiffness Parameters for Basement Excavation | MR. DARRELL CHOONG THIAM CHYE |
17/11/2015 | Static Pile Load Test | IR. DARRYL FONG CHEW CHUNG |
19/11/2015 | Alternative Foundation Design for Sunway RC2 | MR. KWANG KIM LUP |
24/11/2015 | Deep Foundation | DR. GUE CHANG SHIN |
26/11/2015 | Proposed Mixed Development at Dataran Ukay | MS. NORSHAZWINA BINTI JOHARI |
01/12/2015 | High Strain Dynamic Pile Test | IR. LOH YEE ENG |
03/12/2015 | Procedure on Role of Checker & Reviewer | IR. PUSPANATHAN SUBRAMANIAM |
03/12/2015 | Hill Site Development at Cheras Hijauan | MR. TEO LII BINN |
08/12/2015 | Pull Out Test for Soil Nail | IR. KOO KUAN SENG |
10/12/2015 | Affordable House Scheme at Ampang Jajar | MS. ATIQAH BINTI AZMI |
15/12/2015 | Introduction to Plaxis Finite Element Analyses | IR. LOW CHEE LEONG |
17/12/2015 | Highrise on Limestone | MS. NURSYAKIRAH BINTI ISMAIL |
23/12/2015 | Proposed Development at Mukim Setapak (Wangsa Maju Condo) | MR. WONG KOK WENG, ALBERT |
29/12/2015 | Introduction To PDS Workshop | IR. DR. WONG SHIAO YUN/MS. TEI CHIEW LING |
31/12/2015 | Proposed Development at Bukit Tunku, Kuala Lumpur | MR. MOSES HON CHA YAT |
Note: The above schedule is subject to changes from time to time.
ISO Colloquium | |
Training Colloquium | |
Technical Colloquium | |
Geologist Colloquium |
Date | Title Of Talks | Name Of Staff |
6/01/2014 | Procedure for PQP | MR. ASHTON HONG BOON KHANG |
6/01/2014 | Bored Pile at Limestone for KVMRT project | MS. TEH WAI SAN |
9/01/2014 | Effect of Groundwater to Geotechnical Works | IR. LIEW SHAW SHONG |
16/01/2014 | Face Stability Assessment for Tunnelling | IR. CHOW CHEE MENG |
21/01/2014 | Vane Shear Test | IR. LEE PEIR TIEN/IR. SHAFINA SABARUDDIN |
23/01/2014 | HRPB – Construction Issues | MS. NOOR AZLINA BTE AZHARI |
28/01/2014 | Presentation for R&D | IR. CHEAH SIEW WAI |
6/02/2014 | Procedure for Design Control | MS. KANG YEE PING |
13/02/2014 | Lesson Learnt on Oaxis Project | IR. LEE PEIR TIEN |
18/02/2014 | Point Load Test | IR. LOH YEE ENG |
26/02/2014 | Standard Penetration Test & Mackintosh Test | IR. LOW CHEE LEONG |
4/03/2014 | Earthwork Compaction | IR. CHEAH SIEW WAI |
6/03/2014 | Procedure for Quality Records | MR. LAM YOKE ‘WOH |
6/03/2014 | Foundation Design for Phase G8, Elmina East | IR. SHAFINA SABARUDDIN |
11/03/2014 | Permeability Test | IR. LOW CHEE LEONG |
13/03/2014 | Ground Treatment Design of Embankment for EDTP Project | IR. TAN YEAN CHIN |
19/03/2014 | Effective Stress | IR. TAN YEAN CHIN |
20/03/2014 | Deep Excavation in KL limestone | IR. KOO KUAN SENG |
1/04/2014 | How To Be A Good Engineers | IR. TAN YEAN CHIN |
3/04/2014 | Procedure for Document and Data Control | MS. TEH WAI SAN |
3/04/2014 | Investigation and Remedial Works On RS Wall Failure | IR. CHEAH SIEW WAI |
8/04/2014 | Shear Strength | IR. TAN YEAN CHIN |
10/04/2014 | Understanding of Holebase III | MR. TIONG CHIONG NGU, PHILIP |
17/04/2014 | Substructure Constructions for Multi-phases Highrise Development in Kuala Lumpur City Centre | IR. LOH YEE ENG |
29/04/2014 | Stress in Soil Masses//Stress Path (Part 1) | IR. TAN YEAN CHIN |
7/05/2014 | Stress in Soil Masses//Stress Path (Part 2) | IR. TAN YEAN CHIN |
8/05/2014 | Introduction to ISO Standard | MS. NOOR AZLINA BTE AZHARI |
17/05/2014 | Introduction To PDS Workshop | IR. DR. WONG SHIAO YUN/MS. TEI CHIEW LING |
3/06/2014 | Sonic Logging Test & Interpretation | MR. PUSPANATHAN SUBRAMANIAM |
5/06/2014 | Procedure for Internal Quality Audit | MS. KHOO LAI PENG |
17/06/2014 | Jack-in Pile in Limestone Formation-One Octagon, | Ipoh MR. LEE YAP CHONG, JOHN |
24/06/2014 | Deformability/Consolidation | IR. CHEAH SIEW WAI |
26/06/2014 | Dam Safety Review | MS. TEH WAI SAN |
3/07/2014 | Procedure for Design, Review, Verification & Validation | MR. JASON LIM AING HO |
3/07/2014 | Temperature Effects on Lab Measured Soil Strength | DR. GUE CHANG SHIN |
4/07/2014 | Checklist on Investigation of Failure & Expert Opinion | DATO’ IR. DR. GUE SEE SEW |
7/07/2014 | Permeability & Seepage | IR. DR. WONG SHIAO YUN |
8/07/2014 | Comparison between bentonite and polymer drilling fluid | IR. HO SHU FENG |
17/07/2014 | Geotechnical Interpretation and Design of PR1MA, Phase 1, Seremban Sentral | IR. LOW CHEE LEONG |
18/07/2014 | Introduction to Critical State Soil Mechanics (Part 1 & 2) | IR. TAN YEAN CHIN |
22/07/2014 | Soil Slope Stability | MS. TEI CHIEW LING |
11/08/2014 | Characterisation of Soils for Engineering Purposes | IR. CHOW CHEE MENG |
12/08/2014 | Tanjung Langsat Foundation Design | IR. TING DENG ING |
14/08/2014 | Unified Method of Pile Design (by Dr. B. Fellenius) | IR. DARRYL FONG CHEW CHUNG |
28/08/2014 | Procedure for Client Feedback | MS. ONG KAH PENG |
29/08/2014 | Rock Slope Stability | MR. TIONG CHIONG NGU, PHILIP |
11/09/2014 | Procedure for Product Identification and Traceability | MR. LEE YAP CHONG, JOHN |
11/09/2014 | Brief Introduction of Ampar Tenang Development | MR. LIANG YIT CHUNG, STEVE |
25/09/2014 | Engineering Practice for Earthwork Design and Construction | MR. ASHTON HONG BOON KHANG |
2/10/2014 | ISO 9001 Overview | MS. TEI CHIEW LING |
2/10/2014 | Proposed Development of Mont’ Kiara 22 (MK22), Kuala Lumpur | MS. KANG YEE PING |
15/10/2014 | Modeling in Plaxis 3D for Tanjung Bin Coal-Fired Power Plan | MR. SOH TEK PENG |
17/10/2014 | Retaining Structures | IR. TING DENG ING |
21/10/2014 | Ground Improvement | IR. SHAFINA SABARUDDIN/IR. LEE PEIR TIEN |
23/10/2014 | Penang World City – Design Concept Reclamation | MR. JASON LIM AING HO |
28/10/2013 | Settlement Analysis | IR. HO SHU FENG |
3/11/2014 | Solaris 3-Demarcation of Preliminary Building Setback (Soil Nailed Slope) | MR. LAM YOKE WOH |
4/11/2014 | Skyz Residence-Slope Strengthening Works | MS. ONG KAH PENG |
7/11/2014 | Temporary Support System Design for Proposed Business Complex at Pusat Bandar Melawati | MR. LIM BOON LIN, COLIN |
10/11/2014 | Design of Retaining Wall and Support Systems for Deep Basement Construction | IR. CHOW CHEE MENG |
11/11/2014 | Static Pile Load Test | IR. DARRYL FONG CHEW CHUNG |
17/11/2014 | Training for SAFE | MR. PUSPANATHAN SUBRAMANIAM |
18/11/2014 | Procedure for Site Supervision Plan | MR. LIANG YIT CHUNG, STEVE |
21/11/2014 | Biomass Excavation | MS. TEI CHIEW LING |
25/11/2014 | Deep Foundation | DR. GUE CHANG SHIN |
27/11/2014 | Review on Development Nearby Batu Cave Temple | MR. CHEE FONG WAH |
28/11/2014 | Bored Piling Works for Serviced Apartments at Jalan Talalla | MR. DARRELL CHOONG THIAM CHYE |
1/12/2014 | Shallow Foundation | IR. CHOW CHEE MENG |
3/12/2014 | Proposed Development at Teluk Kumbar, Penang | MR. KWANG KIM LUP |
4/12/2014 | Procedure on Role of Checker & Reviewer | MR. SOH TEK PENG |
5/12/2014 | Investigation of Embankment Failure at Switchyard, Tanjung Bin | MS. NORSHAZWINA BINTI JOHARI |
8/12/2014 | Overview of Pilecap Design | MS. KHOO LAI PENG |
9/12/2014 | High Strain Dynamic Pile Test | IR. LOH YEE ENG |
12/12/2014 | Cone Penetration Test (CPU/CPTU) | IR. TING DENG ING |
16/12/2014 | Pull Out Test for Soil Nail | IR. KOO KUAN SENG |
18/12/2014 | Vision Park, Bayan Lepas | MS. ATIQAH BINIT AZMI |
22/12/2014 | Geotechnical Assessment & Slope Strengthening at Lot 2359 | MR. SEAH CHOON SHEAN |
30/12/2014 | Introduction to Plaxis Finite Element Analyses | IR. LOW CHEE LEONG |
31/12/2014 | Highrise on Limestone | MS. NURSYAKIRAH BINTI ISMAIL |
Note: The above schedule is subject to changes from time to time.
ISO Colloquium | |
Training Colloquium | |
Technical Colloquium |
Date | Title Of Talks |
Name Of Staff
|
09/01/2013 | Standard Penetration Test & Mackintosh Test |
IR. LOW CHEE LEONG
|
16/01/2013 | Procedure for PQP |
MR. ASHTON HONG BOON KHANG
|
17/01/2013 | Vane Shear Test |
IR. LEE PEIR TIEN /IR. SHAFINA SABARUDDIN |
22/01/2013 | Lessons Learnt from Slope Failure along Roads in Hilly Terrain |
IR. JACK PAN KOK LOONG
|
23/01/2013 | Forensic Engineering in Geotechnical Works |
IR. LIEW SHAW SHONG
|
29/01/2013 | Permeability Test |
IR. CHOONG KEAN WUI |
30/01/2013 | Introdution to SAFE 12 |
MR. PUSPANATHAN SUBRAMANIAM
|
31/01/2013 | Lesson Learns from Jambatan Kedua Sultan Yahya Petra, Kota Bharu |
MS. NOOR AZLINA BTE AZHARI
|
07/02/2013 | Procedure for Design Control |
MR. TONG HAN SENG
|
20/02/2013 | Introdution to Geotechnical Earthquake Design |
IR. CHOW CHEE MENG
|
21/02/2013 | Tailing Dam – Design |
IR. LEE PEIR TIEN
|
26/02/2013 | Point Load Test |
IR. LOH YEE ENG
|
28/02/2013 | Submarine Landslide Flows Simulation Through Centrifuge Modelling |
IR. DR. GUE SEE SEW
|
07/03/2012 | Procedure for Quality Records |
MR. LAM YOKE WOH
|
12/03/2013 | Effective Stress |
IR. TAN YEAN CHIN
|
19/03/2013 | Earthwork Compaction |
IR. WONG YIK FONG
|
21/03/2013 | Slope Remedial Works at UK Height |
IR. SHAFINA SABARUDDIN
|
26/03/2013 | Slave Excel with VBA |
IR. CHEAH SIEW WAI
|
27/03/2013 | Shear Strength |
IR. TAN YEAN CHIN
|
28/03/2013 | Ground Treatment Design of Embankment for EDTP Project |
IR. TAN YEAN CHIN
|
04/04/2013 | Procedure for Document and Data Control |
MS. TEH WAI SAN
|
09/04/2013 | Stress in Soil Masses/Stress Path (Part 1) |
IR. TAN YEAN CHIN
|
11/04/2013 | Foundation Design for Water Tank |
IR. TING DENG ING
|
18/04/2013 | Design and Construction of Excavation Works for KVMRT Underground Station at Cochrane |
IR. KOO KUAN SENG
|
23/04/2013 | Stress in Soil Masses/Stress Path (Part 2) |
IR. TAN YEAN CHIN
|
25/04/2013 | Overview on subsoil profile for tailing bunds |
MS. NURUL AINAA BTE SELAMAT
|
02/05/2013 | Introduction to ISO Standard |
MS. TEI CHIEW LING
|
07/05/2013 | Introduction to Critical Sate Soil Mechanics (Part 1) |
IR. TAN YEAN CHIN
|
09/05/2013 | Tunnelling Mapping Using Q-System |
MR. TIONG CHIONG NGU, PHILIP
|
16/05/2013 | Post Base Grouting for Bored Pile |
IR. HO SHU FENG
|
21/05/2013 | Introduction to Critical Sate Soil Mechanics (Part 2) |
IR. TAN YEAN CHIN
|
23/05/2013 | Design and Construction Consideration for Strutting Elements |
IR. LOH YEE ENG
|
30/05/2013 | Polymer Slurry for Excavation Protection |
MR. LEE YAP CHONG, JOHN
|
04/06/2013 | Permeability & Seepage |
IR. DR. WONG SHIAO YUN
|
06/06/2013 | Procedure for Internal Quality Audit |
MS. KANG YEE PING
|
11/06/2013 | Submarine Landslide Flows Simulation Through Centrifuge Modelling |
DR. GUE CHANG SHIN
|
13/06/2013 | Geotechnical Design of Residential Development at Wangsa Maju |
MR. LIANG YIT CHUNG, STEVE
|
18/06/2013 | Deformability/Consolidation |
IR. CHEAH SIEW WAI
|
20/06/2013 | Settlement Monitoring for Softground Improvement |
MS. WAN NURULHIDAYAH WAN HUSSIN
|
25/06/2013 | Introduction to PLAXIS 3D |
MR. TONG HAN SENG
|
02/07/2013 | Characterisation of Soils for Engineering Purposes |
IR. CHOW CHEE MENG
|
04/07/2013 | Procedure for Design, Review, Verification & Validation |
MS. KHOO LAI PENG
|
11/07/2013 | Alternative Foundation Design for Villa Raflesia, Sentul (Bintai) |
IR. LOW CHEE LEONG
|
16/07/2013 | Soil Slope Stability |
MS. TEI CHIEW LING
|
18/07/2013 | CBP Wall Design for Dato’Lin’s Bungalow |
IR. DR. WONG SHIAO YUN
|
25/07/2013 | Feasibility study for Resident South, Puteri Harbour |
MS. TEI CHEW LING
|
30/07/2013 | Rock Slope Stability |
MR. TIONG CHIONG NGU
|
01/08/2013 | Procedure for Client Feedback |
MR. JASON LIM AING HO
|
08/08/2013 | Introduction to GFRP Soft Eye for TBM Breakthrough |
MR. ASHTON HONG BOON KHANG
|
13/08/2013 | Retaining Structure |
IR. TING DENG ING
|
15/08/2013 | Overview of Soil Nailed Wall Design |
MS. KANG YEE PING
|
22/08/2013 | Review on Plate Bearing Test Results |
MS. TEH WAI SAN
|
27/08/2013 | Design of Retaining Wall and Support Systems for Deep Basement Construction |
IR. CHOW CHEE MENG
|
29/08/2013 | Experience in Top-Down Construction Works for Aurora Tower |
IR. CHOONG kEAN WUI
|
03/09/2013 | Training for SAFE |
IR. CHEAH SIEW WAI
|
05/09/2013 | Procedure for Product Identification and Traceability |
MS. ONG KAH PENG
|
10/09/2013 | Groud Improvement |
IR. SHAFINA SABARUDDIN /
IR. LEE PEIR TIEN |
12/09/2013 | Foundation Design for TM2 & TM3 |
MR. LAM YOKE WOH
|
19/09/2013 | Design of RS Wall Using Geosynthetics |
IR. DARRYL FONG CHEW CHUNG
|
24/09/2013 | Shallow Foundation |
IR. CHOW CHEE MENG
|
26/09/2013 | Foundation Design for Jade Home CP3 |
IR. WONG YIK FONG
|
03/10/2013 | ISO 9001 Overview |
MS. NOOR AZLINA BTE AZHARI
|
08/10/2013 | Cone Penetration Test (CPU/CPTU) |
IR. TING DENG ING
|
10/10/2013 | QC for Earthwork Compaction |
MS. KHOO LAI PENG
|
17/10/2013 | Foundation System at Robertson Works |
MR. VINCENT VOON BOO CHUAN
|
22/10/2013 | Settlement Analysis |
IR. HO SHU FENG
|
24/10/2013 | Secant Pile Wall with Ground Anchor |
MR. KHAW YONG HUI
|
31/10/2013 | Performance of High Capacity Jack-In Pile for High-Rise Building with Preboring in Weathered Sedimentary Rock Formation |
MR. JASON LIM AING HO
|
05/11/2013 | Static Pile Load Test |
IR. DARRYL FONG CHEW CHUNG
|
07/11/2013 | Procedure for Site Supervision Plan |
MR. KHAW YONG HUI
|
14/11/2013 | Overview on Parcel 2 & 3, D’Estuary Project |
MS. ONG KAH PENG
|
21/11/2013 | Slope Failure Investigation & Remedial Works at Dolomite Templer, Rawang |
MR. WONG LIT KUANG, KEVIN
|
26/11/2013 | Introduction To PDS Workshop |
IR. DR WONG SHIAO YUN /
MS. TEI CHEW LING |
28/11/2013 | Comparison Between Reinforced Soil Wall and Reinforced Concrete |
MR. SEAH CHOON SHEAN
|
03/12/2013 | High Strain Dynamic Pile Test |
IR. LOH YEE ENG
|
05/12/2013 | Procedure on Role of Checker & Reviewer |
MR. VINCENT VOON BOO CHUAN
|
10/12/2013 | Mircopile Design |
MS. CHONG CHEN WAY
|
12/12/2013 | Extension of Basement Car PArk at USJ 21 |
MR. SOH TEK PENG
|
17/12/2013 | Pull Out Test for Soil Nail |
IR. KOO KUAN SENG
|
19/12/2013 | Simple Shear Behavior of Offshore Clay |
MR. LIM BOON LIN, COLIN
|
26/12/2013 | Pile Strip Raft Design for Phase 27C, Bandar Botanic |
MR. DARRELL CHOONG THIAM CHYE
|
31/12/2013 | Introduction to PLAXIS Finite Element Analyses |
IR. LOW CHEE LEONG
|
ISO Colloquium | |
Training Colloquium | |
Technical Colloquium |
Date | Title Of Talks |
Name Of Staff
|
03/01/2012 | Standard Penetration Test & Mackintosh Test |
IR. LOW CHEE LEONG
|
05/01/2012 | Procedure for PQP |
MS. HOW JA-MIE
|
11/01/2012 | Geological Study for MRT Project |
MR. TIONG CHIONG NGU
|
18/01/2012 | Vane Shear Test |
IR. LEE PEIR TIEN /IR. SHAFINA SABARUDDIN |
02/02/2012 | Procedure for Design Control |
MR. NG LEANG YEOW
|
02/02/2012 | Overview on Peat |
MR. PUSPANATHAN SUBRAMANIAM
|
08/02/2012 | Point Load Test |
IR. LOH YEE ENG
|
09/02/2012 | Improved Installation Procedure for Jack-in Pile |
IR. LIEW SHAW SHONG
|
15/02/2012 | Investigation of a Failed Retaining Wall |
IR. JACK PAN KOK LOONG
|
16/02/2012 | Lesson Learnt from Design of SL 123 |
MS. NOOR AZLINA BTE AZHARI
|
21/02/2012 | Behaviour of Open-Ended Pile |
IR. CHOW CHEE MENG
|
22/02/2012 | Permeability Test |
IR. CHOONG KEAN WUI |
28/02/2012 | Effective Stress |
IR. TAN YEAN CHIN
|
01/03/2012 | Procedure for Quality Records |
MR. PUSPANATHAN SUBRAMANIAM
|
07/03/2012 | River Closure Design |
IR. LEE PEIR TIEN
|
08/03/2012 | Case Histories on Disputes for Pile Foundation |
IR. DR. GUE SEE SEW
|
15/03/2012 | PT TUM 60 MT Palm Oil Mill |
IR. CHEAH SIEW WAI
|
21/03/2012 | Shear Strength |
IR. TAN YEAN CHIN
|
23/03/2012 | Earthwork Compaction |
IR. WONG YIK FONG
|
27/03/2012 | Stress in Soil Masses/Stress Path (Part 1) |
IR. TAN YEAN CHIN
|
29/03/2012 | Foundation Design for Hospital |
IR. SHAFINA SABARUDDIN
|
05/04/2012 | Procedure for Document and Data Control |
MR. GU KOK KIN, KENT
|
10/04/2012 | Stress in Soil Masses/Stress Path (Part 2) |
IR. TAN YEAN CHIN
|
16/04/2012 | Simple Approach in Geotech Engineer |
IR. TAN YEAN CHIN
|
24/04/2012 | Introduction to Critical Sate Soil Mechanics (Part 1) |
IR. TAN YEAN CHIN
|
25/04/2012 | RC Wall |
IR. TING DENG ING
|
26/04/2012 | Geotechnical Inspection |
IR. TING DENG ING
|
03/05/2012 | Introduction to ISO Standard |
IR. CHOONG KEAN WUI
|
08/05/2012 | Introduction to Critical Sate Soil Mechanics (Part 2) |
IR. TAN YEAN CHIN
|
10/05/2012 | KVMRT Outline Design Introduction |
IR. KOO KUAN SENG
|
17/05/2012 | Improvement of Soil Strength After Surcharge Treatment |
MS. NURUL AINAA BTE SELAMAT
|
23/05/2012 | Geologist’s Input in Hillsite Development in Malaysia |
Mr. TIONG CHOING NGU
|
23/05/2012 | Engineering Geology Practice in Hong Kong |
IR. JACK PAN KOK LOONG
|
26/05/2012 | Introduction To PDS Workshop |
DR. WONG SHIAO YUN \
MS. TEI CHEW LING |
28/05/2012 | Stress in Soil Masses / Stress Path (Part 2) |
IR. TAN YEAN CHIN
|
29/05/2012 | Deformability / Consolidation |
IR. CHEAH SIEW WAI
|
12/06/2012 | Procedure for Internal Quality Audit |
MR. TONG HAN SENG
|
13/06/2012 | Trial Remedial Works Using Expanded Polystyrene (EPS) and Lightweight Concrete at KM 156.1 North South Expressway |
IR. HO SHU FENG
|
19/06/2012 | Soil Slope Stability |
MS. TEI CHEW LING
|
21/06/2012 | Things to Note in Modelling of Groundwater Table in Plaxis |
IR. LOW CHEE LEONG
|
26/06/2012 | Permeability & Seepage |
IR. DR. Wong SHIAO YUN
|
27/06/2012 | Foundation Design for Platinum Park |
MR. NG LEANG YEOW
|
03/07/2012 | Rock Slope Stability |
MR. TIONG CHIONG NGU
|
04/07/2012 | Characterisation of Soils for Engineering Purposes |
IR. CHOW CHEE MENG
|
05/07/2012 | Slope Strengthening Works at Jalan Wangsa 1, Bukit Antarabangsa |
MR. TONG HAN SENG
|
05/07/2012 | Procedure for Design, Review, Verification & Validation |
MR. ASHTON HONG BOON KHANG
|
10/07/2012 | Completed Soil Nail R & D Assignment in 2011 |
IR. LEE PEIR TIEN,
IR. HO SHU FENG, IR. DR. WONG SHIAO YUN, MR. LAM YOKE WOH |
17/07/2012 | Alternative Design for TC Building |
IR. LOW CHEE LEONG
|
19/07/2012 | Tunnel R & D Presentation |
MR. JACK PAN KOK LOONG
|
23/07/2012 | Contract Administration |
IR. DR. WONG SHIAO YUN |
24/07/2012 | Alternative Design at Melawati Site |
MS. TEI CHEW LING
|
02/08/2012 | Retaining Structure |
IR. TING DENG ING
|
03/08/2012 | Trainee Presentation |
MR. WILLIAM,
MR. LOH KIT SOONG |
07/08/2012 | Ground Improvement |
IR. SHAFINA SABARUDDIN /
IR. LEE PEIR TIEN |
08/08/2012 | SI Works for MRT Tunneling Work |
MR. ASHTON HONG BOON KHANG
|
14/08/2012 | Shallow Foundation |
IR. CHOW CHEE MENG
|
15/08/2012 | Procedure for Client Feedback |
MS. NURUL AINAA BTE SELAMAT
|
16/08/2012 | Introduction of Pressuremeter Test |
MS. KANG YEE PING
|
22/08/2012 | Design of Retaining Wall and Support Systems for Deep Basement Construction |
IR. CHOW CHEE MENG
|
28/08/2012 | Cone Penetration Test (CPU/CPTU) |
IR. TING DENG ING
|
29/08/2012 | Slope Hydrology Analysis |
MS. TEH WAI SAN
|
30/08/2012 | Earthquake Design Consideration in Pile Foundation |
MR. CHOONG KEAN WUI
|
\04/09/2012 | Deep Excavation Design – Sub Group Committee (Part 1) |
IR. LOH YEE ENG, |
05/09/2012 | Geotechnical Investigation on Excessive Pile Deviation |
MR. LAM YOKE WOH
|
06/09/2012 | Procedure for Product Identification and Traceability |
MR. LEE YAP CHONG, JOHN
|
11/09/2012 | Settlement Analysis |
IR. HO SHU FENG
|
11/09/2012 | Deep Excavation Design – Sub Group Committee (Part 2) |
IR. LOH YEE ENG, |
18/09/2012 | Presentation for Piled Foundation Task Completed 2011 |
IR. DARRYL FONG CHEW CHUNG,
MS. TEI CHEW LING |
19/09/2012 | Piled Embankment at Pontian Johor |
MS. HOW JA-MIE
|
27/09/2012 | Slope Strengthening at Lot 40441, Bangsar |
IR. DARRYL FONG CHEW CHUNG
|
04/10/2012 | ISO 9001 Overview |
MS. NOOR AZLINA BTE AZHARI
|
09/10/2012 | Deep Foundation |
IR. JACK PAN KOK LOONG
|
10/10/2012 | Review on Existing Foundation System at VIDC |
IR. WONG YIK FONG
|
11/10/2012 | Rock Mass Classification |
MR. TIONG CHIONG NGU
|
16/10/2012 | Static Pile Load Test |
IR. DARRYL FONG CHEW CHUNG
|
23/10/2012 | High Strain Dynamic Pile Test |
IR. LOH YEE ENG
|
30/10/2012 | Overview of Happy Garden Condo Foundation |
MS. KHOO LAI PENG
|
01/11/2012 | Procedure for Site Supervision Plan |
MR. LIANG YIT CHUNG, STEVE
|
06/11/2012 | Pull Out Test for Soil Nail |
IR. KOO KUAN SENG
|
08/11/2012 | Geotechnical Review on Foundation System at Wangsa Maju 118 |
MR. VINCENT VOON BOO CHUAN
|
20/11/2012 | Introduction to PLAXIS Finite Element Analyses |
IR. LOW CHEE LEONG
|
21/11/2012 | Geotechnical Review for Foundation of Medical Borneo Hospital |
MR. KHAW YONG HUI
|
04/12/2012 | Training for SAFE |
IR. CHEAH SIEW WAI
|
06/12/2012 | Procedure on Role of Checker & Reviewer |
MS. WAN NURULHIDAYAH BTE WAN HUSSIN
|
13/12/2012 | Pavement Response |
MR. JASON LIM AING HO
|
18/12/2012 | Introduction to PDS |
IR. DR. WONG SHIAO YUN
|
20/12/2012 | Overview on Biz Suites Project |
MS. ONG KAH PENG
|
27/12/2012 | Overview on Commonly Adopted Soft Ground Treatment |
MR. WONG LIT KUANG, KEVIN
|
ISO Colloquium | |
Training Colloquium | |
Technical Colloquium |
Date | Title Of Talks |
Name Of Staff
|
04/01/2011 | Vane Shear Test |
IR. LEE PEIR TIEN/IR. SHAFINA SABARUDDIN
|
05/01/2011 | Overview on Ground Treatment Works at Pulai Indah Ring Road |
MR. PUSPANATHAN SUBRAMANIAM
|
06/01/2011 | Procedure for PQP |
MR. AHMAD SYAZWAN BIN MOHD SUKARNO
|
18/01/2011 | Point Load Test |
IR. LEE SEONG TATT
|
25/01/2011 | Close-Ended Conductor Studies for Kebabangan Offshore Project |
IR. CHOW CHEE MENG
|
27/01/2011 | Soft Ground Improvement |
MS. DIANA bte CHE LAT
|
14/02/2011 | Procedure for Design Control |
MS. NURUL AINAA BTE SELAMAT
|
16/02/2011 | Effective Stress |
IR. TAN YEAN CHIN
|
22/02/2011 | Introduction of Tunneling |
IR. JACK PAN KOK LOONG
|
24/02/2011 | Investigation of Soil Nailed Slope Distress at Fill Ground & Remedial Solutions |
MR. JEREMY LIM WEI
|
03/03/2011 | Procedure for Quality Records |
MS. DIANA bte CHE LAT
|
08/03/2011 | Earthwork Compaction |
MR. WONG YIK FONG
|
09/03/2011 | Geotechnical Instrumentation |
IR. LIEW SHAW SHONG
|
10/03/2011 | Sultan Yahya Putra 2nd Bridge |
MS. NOOR AZLINA bte AZHARI
|
15/03/2011 | Shear Strength |
IR. TAN YEAN CHIN
|
17/03/2011 | Slope Failure Investigation at 5 Location Along Hilly Road from Lojing to Gua Musang and Lessons Learnt |
IR. JACK PAN KOK LOONG
|
23/03/2011 | Geotechnical Investigation for Distressed House, Taman Makmur, Sg. Siput |
IR. LEE PEIR TIEN
|
31/03/2011 | Time Management & Discipline |
IR. DR. GUE SEE SEW
|
05/04/2011 | Digital Photography ( Introduction ) |
MR. ROBIN WONG KAH HOE
|
07/04/2011 | Procedure for Document and Data Control |
MS. NOOR AZLINA bte AZHARI
|
12/04/2011 | Stress in Soil Masses/Stress Path (Part 1) |
IR. TAN YEAN CHIN
|
15/04/2011 | RC Wall Failure at Taman Connaught |
IR. CHEAH SIEW WAI
|
19/04/2011 | Permeability & Seepage |
DR. WONG SHIAO YUN
|
21/04/2011 | Geotechnical Review on Permas Jaya 2nd Bridge’s Foundation |
MR. WONG YIK FONG
|
26/04/2011 | Deformability/Consolidation |
IR. CHEAH SIEW WAI
|
10/05/2011 | Stress in Soil Masses/Stress Path (Part 2) |
IR. TAN YEAN CHIN
|
12/05/2011 | Introduction to ISO Standard |
DR. WONG SHIAO YUN
|
12/05/2011 | Characterisation of Soil for Engineering Purposes |
IR. CHOW CHEE MENG
|
13/05/2011 | Design of Embankment Stability Via EC7 |
IR. TAN YEAN CHIN
|
19/05/2011 | Rectification Works for Failed Embankment |
IR. SHAFINA SABARUDDIN
|
24/05/2011 | Soil Slope Stability |
MS. TAN SJE TING
|
25/05/2011 | Pulau Indah Ring Road |
IR. LEE SEONG TATT
|
26/05/2011 | Collapsed Contiguous Bored Pile Wall with Steel Strutting System |
IR. LOH YEE ENG
|
31/05/2011 | Foundation Design for Water Tank |
IR. TING DENG ING
|
07/06/2011 | Introduction to Critical State Soil Mechanics (Part 1) |
IR. TAN YEAN CHIN
|
14/06/2011 | Procedure for Internal Quality Audit |
MR. ROBIN WONG KAH HOE
|
21/06/2011 | Rock Slope Stability |
MR. TIONG CHIONG NGU
|
05/07/2011 | Procedure for Design, Review, Verification & Validation |
MS. HOW JA-MIE
|
07/07/2011 | Taiping Portal Back Analysis |
MR. KOO KUAN SENG
|
12/07/2011 | Ground Slab Settlement at GM Klang Phase 1 |
DR. WONG SHIAO YUN
|
13/07/2011 | How To Be A Good Engineer |
IR. TAN YEAN CHIN
|
19/07/2011 | Retaining Structure |
IR. TING DENG ING |
19/07/2011 | Damansara Uptown Phase 2 |
IR. HO SHU FENG
|
20/07/2011 | Training for SAFE |
IR. CHEAH SIEW WAI
|
26/07/2011 | Introduction to Critical State Soil Mechanics (Part 2) |
IR. TAN YEAN CHIN |
27/07/2011 | Highrise at Bukit Jelutong ( Colloquium ) |
MR. NG LEANG YEOW
|
02/08/2011 | Design of Retaining Wall and Support System for Deep Basement Construction |
IR. CHOW CHEE MENG |
04/08/2011 | Procedure for Client Feedback |
MS. NG LEANG YEOW
|
04/08/2011 | Cavity Treatment |
MS. NURUL AINAA BTE SELAMAT
|
09/08/2011 | Foundation Design for Wetside 2, Parkcity |
IR. LOW CHEE LEONG
|
11/08/2011 | Interface Shear Strength Parameter of Smooth & Rough HDPE |
MR. TONG HANG SENG
|
16/08/2011 | Ground Improvement |
IR. SHAFINA SABARUDDIN
|
23/08/2011 | Lesson Learn From Construction Of Hang Jebat Bridge |
MS. TEI CHEW LING
|
25/08/2011 | PVD |
MR. GU KOK KIN
|
06/09/2011 | Plaxis Analysis On Server |
DR. WONG SHIAO YUN
|
08/09/2011 | Lugeon Test |
MR. HONG BOON KHANG
|
13/09/2011 | Procedure for Product Identification and Traceability |
MS. TEI CHEW LING
|
13/09/2011 | Seismic Test |
MS. KANG YEE PING |
27/09/2011 | Shallow Foundation |
IR. CHOW CHEE MENG
|
29/09/2011 | Rock Slope Stability |
MS. TEH WAI SAN
|
07/10/2011 | Structural Geology |
MR. AHMAD ZULQURNAIN
|
11/10/2011 | Landfill |
MR. LAM YOKE WOH
|
13/10/2011 | ISO 9001 Overview |
MR. GU KOK KIN
|
13/10/2011 | Overview on Peat |
MR. PUSPANATHAN SUBRAMANIAM |
18/10/2011 | Cone Penetration Test (CPU/CPTU) |
IR. TING DENG ING |
20/10/2011 | Deep Foundation |
IR. JACK PAN KOK LOONG |
27/10/2011 | Settlement Analysis |
IR. HO SHU FENG |
01/11/2011 | Static Pile Load Test |
IR. DARRYL FONG CHEW CHUNG
|
10/11/2011 | Procedure for Site Supervision Plan |
MR. TONG HAN SENG |
10/11/2011 | Introduction to Aurora Tower Project |
MR. CHOONG KEAN WUI |
11/11/2011 | Geophysic Method |
MS. SITI ATHIRAH |
15/11/2011 | High Strain Dynamic Pile Test |
MS. LOH YEE ENG
|
22/11/2011 | Foundation Design for Prai Container Stacking Yard |
MS. HOW JA-MIE
|
24/11/2011 | Rehabilitation Works at KM 28.4SB & KM 30.0SB, S5, Second Link |
MR. AHMAD SYAZWAN BIN MOHD SUKARNO
|
29/11/2011 | Pullout Test for Soil Nail |
MR. KOO KUAN SENG
|
01/12/2011 | Procedure on Role of Checker & Reviewer |
MR. PUSPANATHAN SUBRAMANIAM
|
02/12/2011 | Experience Learn from Plus Highway Project |
MR. AHMAD SYUKRAN |
08/12/2011 | Soil Noil Instrumentation Test |
MR. ROBIN WONG KAH HOE
|
13/12/2011 | Introduction to PLAXIS Finite Element Analyses |
IR. LOW CHEE LEONG
|
20/12/2011 | Vibration Assessment at Solaris Mont’ Kiara |
IR. DARRYL FONG CHEW CHUNG |
22/12/2011 | Geological Study for MRT Project |
MR. TIONG CHIONG NGU
|
27/12/2011 | Introduction to PDS |
DR. WONG SHIAO YUN
|
ISO Colloquium | |
Training Colloquium | |
Technical Colloquium | |
Geologist Colloquium |
Date
|
Title Of Talks |
Name Of Staff
|
05/01/2010 | Effective Stress | IR. TAN YEAN CHIN |
07/01/2010 | Procedure for PQP | IR. TING DENG ING |
08/01/2010 | Permeability Test | MR. SUFAIZI BIN ISMAIL |
19/01/2010 | Steel Design | MR. JEREMY LIM WEI |
26/01/2010 | Shear Strength | IR. TAN YEAN CHIN |
27/01/2010 | Seismic Design of Foundations and Slopes | IR. CHOW CHEE MENG |
28/01/2010 | Remedial Works to Alleviate Soft Ground Problem | MS. DIANA bte CHE LAT |
04/02/2010 | Procedure for Design Control | MR. AHMAD SYAZWAN BIN MOHD SUKARNO |
09/02/2010 | Tunneling | IR. LEE PEIR TIEN |
25/02/2010 | Case Studies of Support of Open Excavations and Distressed Retaining Walls in Malaysia | IR. LIEW SHAW SHONG |
04/03/2010 | Procedure for Quality Records | MR. LIM FANG LIANG |
04/03/2010 | Soil Stabilization | MS. NOOR AZLINA bte AZHARI |
09/03/2010 | Stress in Soil Masses/Stress Path (Part 1) | IR. TAN YEAN CHIN |
11/03/2010 | Rock Mass Classification | MR. ASIF BIN ABDULLAH SHAH AIMIN |
18/03/2010 | Flood Mitigation Study for Sg. Mersing Dam | IR. CHEAH SIEW WAI |
24/03/2010 | Foundation on Soft Ground | IR. DR. GUE SEE SEW |
25/03/2010 | Behaviour & Characteristic of Swelling Subsoil Material | IR. LEE SEONG TATT |
06/04/2010 | Earthwork Compaction | MR. WONG YIK FONG |
06/04/2010 | Landfill Project | MR. WONG YIK FONG |
07/04/2010 | Stress in Soil Masses/Stress Path (Part 2) | IR. TAN YEAN CHIN |
15/04/2010 | Soil Nail Construction: What ‘s Wrong? | IR. SHAFINA SABARUDDIN |
22/04/2010 | Introduction of EC7 Malaysian National Annex for Design of Pile Foundation Under Compression Load | IR. TAN YEAN CHIN |
27/04/2010 | Soil Classification | IR. CHOW CHEE MENG |
29/04/2010 | Permeability & Seepage | IR. DR. WONG SHIAO YUN |
04/05/2010 | Introduction to Critical State Soil Mechanics (Part 1) | IR. TAN YEAN CHIN |
06/05/2010 | Procedure for Document and Data Control | MS. LAU LIH SHIONG |
13/05/2010 | Piling Design for Trusan Water Supply, Sarawak | IR. TING DENG ING |
20/05/2010 | Strutting Design | MS. LOH YEE ENG |
25/05/2010 | Introduction to Critical State Soil Mechanics (Part 2) | IR. TAN YEAN CHIN |
26/05/2010 | Deformability/Consolidation | IR. CHEAH SIEW WAI |
27/05/2010 | Pressuremeter Test | IR. HO SHU FENG |
03/06/2010 | Introduction to ISO Standard | IR. LEE SEONG TATT |
03/06/2010 | Soil Slope Stability | MS. TAN SJE TING |
08/06/2009 | Rock Slope Stability | MR. TIONG CHIONG NGU |
22/06/2010 | Retaining Structure | MR. LIM FANG LIANG |
24/06/2010 | Taiping Portal of Berapit Tunnel | MR. KOO KUAN SENG |
06/07/2010 | PDS – PAD Module | IR. DR. WONG SHIAO YUN |
06/07/2010 | Basement | IR. CHOW CHEE MENG |
08/07/2010 | Interpretation of Instrumented Test Pile | MR. NG LEANG YEOW |
13/07/2010 | Inspection & Review on the Existing Bungalow at Bukit Tunku | MS. NURUL AINAA BTE SELAMAT |
16/07/2010 | Some Innovative Approaches Adopted in Platinum Park (Phase 3) | IR. KHOO CHEE MIN |
20/07/2010 | Ground Improvement | IR. SHAFINA SABARUDDIN |
22/07/2010 | Procedure for Internal Quality Audit | MS. DIANA bte CHE LAT |
22/07/2010 | PDS Modeling | MS. TEI CHEW LING |
04/08/2010 | How To Be A Good Engineer | IR. TAN YEAN CHIN |
05/08/2010 | Procedure for Design, Review, Verification & Validation | MR. ROBIN WONG KAH HOE |
12/08/2010 | Parkcity Project | IR. LOW CHEE LEONG |
17/08/2010 | Settlement Analysis | IR. HO SHU FENG |
24/08/2010 | Procedure for Client Feedback | MS. NOOR AZLINA bte AZHARI |
24/08/2010 | SAFE R&D | MR. PUSPANATHAN SUBRAMANIAM |
26/08/2010 | Rock Slope Strengthening Measures | MR. TAN KEE HONG |
30/08/2010 | Deep Foundation | MR. BRYAN LEE CHEE BOON |
01/09/2010 | Shallow Foundation | IR. CHOW CHEE MENG |
02/09/2010 | An Overview of The Current Geotechnical Practise in Hong Kong | IR. JACK PAN KOK LOONG |
14/09/2010 | Cone Penetration Test (CPT/CPTU) | IR. TING DENG ING |
21/09/2010 | Procedure for Product Identification and Traceability | MS. LOH YEE ENG |
23/09/2010 | Back Analysis of Diaphragm Wall at Platinum Park (Phase 3 & 4) | MS. TAN SJE TING |
28/09/2010 | Static Pile Load Test | IR. DARRYL FONG CHEW CHUNG |
30/09/2010 | Lessons Learn from Basement Excavation | MR. CHOONG KEAN WUI |
18/10/2010 | Micropile Underpinning Works | MR. CHOONG KEAN WUI |
20/10/2010 | High Strain Dynamic Pile Test | MS. LOH YEE ENG |
21/10/2010 | Submarine Pipe at Batang Paloh | MR. JEREMY LIM WEI |
26/10/2010 | Remedial Works & Extension of Dato’ Seri’s Bungalow Using EPS | MS. HOW JA-MIE |
04/11/2010 | Remedial Works for RE Wall and Slopes at Lot PT4697, Seksyen 7, Shah Alam | MR. AHMAD SYAZWAN BIN MOHD SUKARNO |
09/11/2010 | Introduction to PLAXIS Finite Element Analyses | IR. CHOW CHEE MENG/IR. LOW CHEE LEONG |
09/11/2010 | Pullout Test for Soil Nail | MR. KOO KUAN SENG |
11/11/2010 | Slope Remedial Works at Jalan Tamparuli-Ranau, Sabah | MR. BRYAN LEE CHEE BOON |
23/11/2010 | Introduction to PDS | IR. KHOO CHEE MIN/IR. DR. WONG SHIAO YUN |
25/11/2010 | Proposed Development (168 acres) at Pelangi Semenyih 2 | MR. LIM FANG LIANG |
30/11/2010 | Effect of Lime Cement Column on Peat | MR. PUSPANATHAN SUBRAMANIAM |
02/12/2010 | ISO 9001 Overview | IR. LEE PEIR TIEN |
02/12/2010 | Procedure for Site Supervision Plan | MR. JEREMY LIM WEI |
09/12/2010 | Interpretation of Subgrade Reaction from Lateral Load Tests on Spun Piles in Soft Ground | IR. DARRYL FONG CHEW CHUNG |
13/12/2010 | Standard Penetration Test & Mackintosh Probe | IR. LOW CHEE LEONG |
14/12/2010 | Forum on Investment – Revisit of Rule #1 | IR. DR. GUE SEE SEW |
21/12/2010 | Permeability Test | MR. CHOONG KEAN WUI |
28/12/2010 | Technique of Geological Terrain Mapping | MR. TIONG CHIONG NGU |
30/12/2010 | Procedure on Role of Checker & Reviewer | MS. TEI CHEW LING |
30/12/2010 | Introduction to Structural Dynamics (Earthquake and Blast Resistant Design) | MR. ROBIN WONG KAH HOE |
ISO Colloquium | |
Training Colloquium | |
Technical Colloquium |
Date | Title Of Talks | Name Of Staff |
07/01/2009 | One-Dimensional Consolidation Test | IR. LEE PEIR TIEN |
08/01/2009 | Consolidated Isotropic Undrained (CIU) Test | IR. CHOW CHEE MENG |
09/01/2009 | Eko Pulp & Paper Mill | MR. CLAUDE PERERA |
13/01/2009 | Procedure for PQP | IR. LOW CHEE LEONG |
20/01/2009 | Settlement Analysis | IR. HO SHU FENG |
21/01/2009 | Six Sigma | IR. CHOW CHEE MENG |
22/01/2009 | Consideration and Design of Cooling Towers | IR. CHEAH SIEW WAI |
03/02/2009 | Shallow Foundation | IR. CHOW CHEE MENG / IR. LOW CHEE LEONG |
05/02/2009 | Procedure for Design Control | MR. WONG CHEN JACK |
18/02/2009 | Pile Foundation for Retaining Wall | IR. LEE SEONG TATT |
19/02/2009 | Tank Farm Foundation Design | IR. LIEW SHAW SHONG |
23/02/2009 | Chemical Testing | MS. TAN SJE TING |
24/02/2009 | Geotechnical Engineering Challenges for Highway Design and Construction | IR. DR. GUE SEE SEW |
02/03/2009 | Procedure for Quality Records | IR. LEE PEIR TIEN |
03/03/2009 | Cone Penetration Test (CPT/CPTU) | MR. TING DENG ING |
10/03/2009 | Deep Foundation | MR. BRYAN LEE CHEE BOON |
17/03/2009 | Static Pile Load Test | MR. DARRYL FONG CHEW CHUNG |
19/03/2009 | FEM Analysis for Embankment Over Softground Area | MR. KOO KUAN SENG |
23/03/2009 | Construction of Retaining Wall (RC & RS) on Fill Ground | MR. ASIF BIN ABDULLAH SHAH AIMIN |
26/03/2009 | Pile Strip Raft Construction at Bandar Bukit Raja, Klang | MS. NUR HAYATI bte ABDUL RAHMAN |
31/03/2009 | High Strain Dynamic Pile Test | MR. FONG FEI SEONG |
09/04/2009 | Application of Consolidation Theory to Practise | IR. SHAFINA SABARUDDIN |
14/04/2009 | Ground Improvement | IR. SHAFINA SABARUDDIN |
16/04/2009 | Procedure for Design, Review, Verification & Validation | MR. TAY JOO KING |
23/04/2009 | RC Wall Design Basis for Electrified Double Tracking Project | MR. TING DENG ING |
28/04/2009 | Jack-in Pile (RC & Spun) | MR. FONG FEI SEONG |
30/04/2009 | ABF Cooling Tower Foundation and Design Issues | MR. LIM FANG LIANG |
07/05/2009 | Foundation on Granite Formation – Lessons Learnt from Neo Damansara | IR. HO SHU FENG |
12/05/2009 | Driven Pile (RC & Spun) | IR. HO SHU FENG |
21/05/2009 | Summary of Understanding Contract (Part 1) | MR. WONG YIK FONG |
21/05/2009 | Procedure for Document and Data Control | MS. LAU LIH SHIONG |
26/05/2009 | Reinforced Concrete (RC) Wall | MR. WONG YIK FONG |
28/05/2009 | Top-Down Construction | MS. LOH YEE ENG |
09/06/2009 | Soil Nail | IR. TING DENG ING |
10/06/2009 | Bi-directional Static Load Test | IR. LEE SEONG TATT |
18/06/2009 | Introduction to ISO Standard | IR. CHEAH SIEW WAI |
23/06/2009 | Prefabricated Vertical Drain (PVD) | IR. SHAFINA SABARUDDIN |
24/06/2009 | Hazard & Risk Assessment | DR. WONG SHIAO YUN |
25/06/2009 | Langsat Terminal (One) & Langsat CTF at the Port of Tg. Langsat, Johor | MS. NOOR AZLINA bte AZHARI |
03/07/2009 | Literature Study – Site Investigation (Description and Classification of Soils and Rocks) | EN. CHE NORHISHAM BIN CHE DAUD / EN. AHMAD SYUKRAN BIN ISHAK / EN. MOHD IDHAM BIN MANSOR / EN. MUHAMMAD THARIQ BIN JUSOF KHADIDI |
07/07/2009 | Geotechnical Data-Evaluation of CPT Testing | IR. SHAFINA SABARUDDIN |
09/07/2009 | Earthwork Design for Taman Bukit Kepayang (Phase M1) | IR. TING DENG ING |
13/07/2009 | How To Be A Good Engineer | IR. TAN YEAN CHIN |
15/07/2009 | Jack-in Pile Design | IR. CHOW CHEE MEING |
16/07/2009 | Basement Excavation for Platinum Park | IR. KHOO CHEE MIN |
21/07/2009 | Geotechnical Data-Shear Strength Derivation | IR. LOW CHEE LEONG |
23/07/2009 | Procedure for Internal Quality Audit | MS. DIANA bte CHE LAT |
23/07/2009 | Pile Strip Raft at Batu Pahat (Part 2) | MR. JEREMY LIM WEI |
24/07/2009 | Literature Study – Site Investigation (Subsurface Exploration: Engineering Geophysics) | EN. MOHD ZUL IQBAL BIN HAMZAH /� EN. FAROUK RAZLAN BIN ABDUL RAHIM / CIK ZULHAIDA bte ZULKEPELI |
04/08/2009 | Shallow Foundation | IR. CHEAH SIEW WAI / MR. CHOONG KIEAN WUI |
06/08/2009 | Double Track | IR. LEE PEIR TIEN |
07/08/2009 | Literature Study – Site Investigation | MR. TIONG CHIONG NGU |
11/08/2009 | Proposed to Pulau Indah Ring Road | MR. WONG CHEN JACK |
18/08/2009 | Pile Foundation | DR. WONG SHIAO YUN/MR. LEE CHEE BOON |
20/08/2009 | Procedure for Site Supervision Plan | MS. NOOR AZLINA bte AZHARI |
21/08/2009 | Literature Study – Site Investigation (In-situ Testing) | EN. MOHD HASHRIQ BIN TALIB / EN. MOHD ZULKARNAIN BIN ABDUL MANAN |
27/08/2009 | Bebo Arch Pedestrian Bridge Across Sg. Melaka | MS. TEI CHIEW LING |
03/09/2009 | Seismic Refraction Survey | MS. LAU LIH SHIONG |
04/09/2009 | Literature Study – Site Investigation (Sampling and Sample Disturbance) | EN. SUFAIZI BIN ISMAIL / EN. MOHD ZAHIR BIN NORDIN |
08/09/2009 | Retaining Structures-External Stability (RC Wall & Gravity Wall) | IR. HO SHU FENG |
10/09/2009 | Investigation on Slope Erosion at Tamar TAR 2 Boundary | MR. FONG FEI SEONG |
11/09/2009 | Literature Study – Site Investigation (The Desk Study and Walk-Over Survey) | MR. TIONG CHIONG NGU |
14/09/2009 | Borehole Drilling Practice Today | MS. KHOO MEI AI |
15/09/2009 | Retaining Structures-External Stability (Reinforced Soil Wall) | IR. DARRYL FONG CHEW CHUNG |
17/09/2009 | Procedure for Client Feedback | MS. NURUL AINAA bte SELAMAT |
18/09/2009 | Literature Study – Site Investigation | EN. WAN A.D.ADLY BIN WAN AZMY / EN. MOHD SHAIRUL ASWAN BIN ROSLAN |
24/09/2009 | Write Like a Professional | IR. LOW CHEE LEONG |
01/10/2009 | Foundation Design for Warehouse & Distribution Centre | MR. CHOONG KEAN WUI |
02/10/2009 | Literature Study – Site Investigation (Subsurface Exploration: Boring, Drilling, Probing and Trial Pitting) | EN. WAN A.D.ADLY BIN WAN AZMY / EN. MOHD SHAIRUL ASWAN BIN ROSLAN |
06/10/2009 | Retaining Structures-External Stability (Embedded Wall) | MR. FONG FEI SEONG (IR. TAN YEAN CHIN) |
08/10/2008 | Laboratory Soil Test | MR. NG LEANG YEOW |
13/10/2009 | Hydraulic Failure | MR. KOO KUAN SENG |
15/10/2009 | Interpretation of Piezocone | MR. AHMAD SYAZWAN BIN MOHD SUKARNO |
22/10/2009 | Procedure for Product Identification and Traceability | MR. BRYAN LEE CHEE BOON |
28/10/2009 | Standard Penetration Test | IR. KHOO CHEE MIN |
29/10/2009 | Role of Geotechnical Engineer | IR. LIEW SHAW SHONG |
30/10/2009 | Literature Study – Site Investigation (Planning and Procurement) | EN. CLAUDE PERERA / EN. FADHLIL WAFI BIN ISHAK |
03/11/2009 | Laboratory Soil Test (CIU & Direct Shear Box) | MR. NG LEANG YEOW / EN. KHOMAEDI HOMAINI |
05/11/2009 | Interpretation of High Strain Dynamic Load Test | MR. DARRYL FONG CHEW CHUNG |
06/11/2009 | Literature Study – Site Investigation (Basic Field Instrumentation for Site Investigation) | EN. MUHAMAD NAJIB BIN ISMAIL |
17/11/2009 | Design of Lateral Pile | MR. BRYAN LEE CHEE BOON |
18/11/2009 | Mackintosh Probe | IR. KHOO CHEE MIN |
18/11/2009 | Subsurface Investigation (SI) Database & Electronic – BOQ | IR. CHEAH SIEW WAI |
19/11/2009 | ISO 9001 Overview | MR. ROBIN WONG KAH HOE |
20/11/2009 | Literature Study – Site Investigation (Undisturbed Sampling Techniques) | EN. ALIAS BIN HAMZAH |
24/11/2009 | Permeability Test | MR. CHOONG KEAN WUI |
26/11/2009 | Investigation into Retaining Wall Failure at Ecooils Processors Sdn Bhd, Nilai | MR. LIM FANG LIANG |
03/12/2009 | Residential Houses in Western Australia | MR. ROBIN WONG KAH HOE |
08/12/2009 | Vane Shear Test | IR. LEE PIER TIEN / IR. SHAFINA SABARRUDIN |
10/12/2009 | Pile Testing | MS. TAN SJE TING |
15/12/2009 | Retaining Wall | MR. JEREMY LIM WEI |
17/12/2009 | Foundation Settlement (Prediction: An Approximate Method) | MR. KOO KUAN SENG |
22/12/2009 | Point Load Test | IR. LEE SEONG TATT |
24/12/2009 | Procedure on Role of Checker & Reviewer | IR. CHEAH SIEW WAI |
ISO Colloquium | |
Training Colloquium | |
Technical Colloquium |
CONTACT US
G&P Professionals Sdn Bhd (622734W)
Tel: +60 (3) - 9059 5396
Fax: +60 (3) - 9059 5594
E-mail : gnp@gnpgroup.com.my