Featured Projects
Power Station Cooling Water Foam Study at Port Dickson, Negeri Sembilan and Manjung, Perak
Client: TNB Research Sdn. Bhd.
Sub-con for “Detailed Environmental Impact Assessment (DEIA) for the Proposed Construction of Breakwater, Capital Dredging and Other Ancillary Works for the New Deep-Water Terminal at Kuantan Port, Pahang”.
Client: ECERDC
Consultancy Services for Proposed Reclamation of 170 Acres For Mixed Development at Pekan Klebang, Melaka.
Client: Listari Marina Sdn. Bhd.
River Transportation Assessment for “Sungai Langat Water Abstraction Studies for Megasteel Sdn Bhd”, through ASPEC/Jurutera Perunding Zaaba Sdn. Bhd.
Client: The Lion Group/Megasteel Sdn. Bhd.
Engineering Consultancy Service for 25,000MT Load Out Facility Phase 1 and Phase 4 (Skid Track and Jacking Foundation), Pasir Gudang, Johor.
Client: Malaysian Marine & Heavy Engineering Sdn Bhd (MMHE), Yard Optimisation Division
Review and Submitting Engineer for ESSAR Engineering Services Ltd for Phase 1A (onshore works) of 15MTPA Iron Ore Distribution Centre of M/S Vale at Teluk Rubiah, Lumut.
Client:�Aegis Limited, Essar Engineering Services Division, India
Independent Assessment of APEC Fisheries Working Group & Marine Resource Conservation Working Group.
Client: SCE of Asia Pacific Economic Cooperation (APEC), Singapore
Project No. SCE 02/2010
Peer Review of the Design of Proposed Berthing Facilities for:
Sebulu CPO Barge/Shipping Vessel Loading Terminal.
Client: The Metro Kajang Group (P.T. Khaleeda Agroprima Malindo, Kalimantan, Indonesia)
Design of HDPE Submarine Water Pipes�Crossing at Batang Paloh, Sarawak.
Client: PPES Works Sarawak Sdn. Bhd.
Integrated River Basin Management Study:
Sungai Perak – Coastal aspects & River Navigation.
Client: Department of Irrigation and Drainage, Malaysia
Review of the National Water Resources Study (2000-2050) and Formulation of National Water Resources Policy – River Transportation and Coastal Aspects, and institutional and Functions Assessment.
Client: Department of Irrigation and Drainage, Malaysia
Design Review for Revetment Design at Rimba Terjun Landfill Closure Project.
Client: Cypark Resources Berhad
An Integrated Environmental Study for the Proposed Coastal Developments in Labuan.
Client: Perbadanan Labuan
Proposed 3,300 acres coastal reclamation works for Port Facilities in Selangor.
Client: Wijaya Baru Sdn. Bhd.
Redevelopment of Kota Kinabalu Airport.
Technical evaluation of coastal runway extension reclamation, coastal processes and protection proposal.
Client: KLIA Consultancy Services Sdn. Bhd.
Proposed Jetty Upgrading Works at Lumut, Perak.
Rehabilitation of existing jetty, new jetty extension, breasting and mooring dolphins, slope strengthening works to cater for deepening of berthing area for 32,000 DWT semi-submersible heavy transport/product carriers.
Client: Pembinaan DPT Sdn. Bhd. / IMPSA (M) Sdn. Bhd.
Sg. Kelantan Flood Mitigation (017GW06 G&P Professional Project No).
Client: Capital Castle Sdn. Bhd. – Darul Naim Infra Sdn. Bhd. JV
Sg. Klang River Basin Flood Mitigation and Maintenance Scheme.
Client: Wijaya Baru Sdn. Bhd.