FEATURED PROJECTS
Description: Miri Water Supply Source Developement
Description: Tg. Manis Water Supply
Phase 1- RBF System
Description: Bukit Kota.Limpaong/Buangsiol/ Kampung Extension Limba
Description: Proposed Sungai Similajau Reservoir and Associated Facilities
Description: Matading Bedengan Subcenter, Mukah
Description: Batang Ai Hydrological Review, Dambreak and Emergency Response Plan
Description: Water Reticulation Works at Lahad Datu, Sabah
Description: Kampung Bruit Extension, Daro, Mukah
Description: Sg Asap Treatment Plant
Description: Proposed Extension for Canteen and Korporasi at SMK Bandar Bintulu
Description: Proposed Water Resource Development Option Master Plan Study
Description: Dam Safety Review For Gerugu Dam: Hydrological Review, Reservoir Storage And Yield Review, Storage Prediction Model, Dam Break Study, Emergency Response Plan And Dam Safety Inspection And Review
Description: The Site Investigation, Survey, Design, Supply, Delivery, Construction, Completion, Testing And Commissioning Of A Proposed Community Based And Operated Water Supply System And Associated Works, Nanga Semah.
Description: Proposed 3 Storey Showroom Cum Office With Mezzanine Floor & Roof Parking On Lot 198 (Lot 1), Sec 64 Ktld, Jln Dtk Abang Abd Rahim, Kch For Messrs Hap Seng Land Development (Puchong) Sdn Bhd
Description: The Investigation, Survey, Design, Tender Documentation and Construction Supervision for The Proposed Pipeline from Nyabau Water Treatment Plant to Kidurong Industrial Estate, Bintulu Division
Description: The Proposed Sri Aman Industrial Area, Sri Aman Division
Description: The Proposed Miri Water Supply Source Development Phase 2, Miri Division
Description: The Construction and Completion of Proposed Sekuau Centre, Selangau, Sibu